7
Comes with Liquid Propane (LP) orifice (#66) INSTALLED on the valve. Natural Gas (NG) orifice (#56)
comes within packaging.
To install:
Screw threaded part of the valve into the side of the grill until stainless steel bracket lines up with
screw holes.
Install supplied Philips screws & stainless steel washers to fasten the bracket to the grill.
Snug up the threaded part of the valve, making sure NOT to over tighten.
Attach gas supply hose onto the valve.
For use with NG:
Remove LP orifice from valve, install NG orifice, making sure NOT to over tighten.
Remove cooking grid, remove flame diffuser, and then remove the stainless burner tube. Loosen the
Philips screw at the end of the burner and close air shutter so it is open 1/16
th
of an inch.
STEP 3
TO INSTALL SUPPLIED ROTISSERIE KIT
To install:
The rotisserie brackets will come factory installed onto the grill.
The bushing should already be installed on one end of the rotisserie rod. Make sure the bushing is
installed with the set screw on the inner side, with the rotisserie rod even or slightly inside the outer
edge of the bushing.
Slide the 2 forks and counter balance onto the rotisserie rod.
Slide rotisserie motor onto the
RIGHT SIDE
bracket, place the square pointed end of rotisserie rod
into the motor, and place the bushing into the slot on the
LEFT SIDE
bracket.
When installed correctly, it should look as illustrated:
Содержание Versa 100 JPG100-PKG1
Страница 13: ...13 PARTS LIST AND EXPLODED VIEW...