Engine Overhaul Manual
Jabiru Aircraft
Pty Ltd
Jabiru 2200 & 3300 Aircraft Engines
This document is controlled while it remains on the Jabiru server. Once this no longer applies the document becomes uncontrolled.
ISSUE
1
2
3
4
5
6 7
Dated : 28/10/2014
Issued By: AS
Page: 167 of 201
L:\files\Manuals_For_Products\Engine_Manuals\Overhaul_Manual\JEM0001-7_Overhaul_Manual_DRAFT_(29_10_14).docx
9.8 Sample Completed Build Sheet
Table 15
– Build Sheet A (EXAMPLE)
No.
Details
Para
Initials
Checked By
Date
A1
Inspect for Burrs, Oil Holes, Chamfers; Clean
Crankshaft, Conrods and Propeller Mount Plate
0.0
XYZ
1-1-13
A2
Inspect Oil Holes and insert Welch Plugs
0.0
XYZ
1-1-13
A3
Measure Crankshaft dimensions. (Includes crank
run-out)
0.0
XYZ
1-1-13
A4
Inspect and measure Propeller Mount Flange
(includes flange run-out)
0.0
XYZ
1-1-13
A5
Inspect and measure Conrods (includes bearing
crush, bearing clearance)
0.0
XYZ
1-1-13
A6
Temporarily Mount Propeller Mount Flange to
Crankshaft and bolt to stand
0.0
XYZ
1-1-13
A7
Fit the Conrods to the Crankshaft; Use Loctite
620 on the bolts and torque per Table 9
0.0
XYZ
1-1-13
A8
Record measurements & clearances in build
record
sheet
-
Ensure
all
measurements and clearances are within the
appropriate limits given in Table 10 and Table 12
-
XYZ
1-1-13
A9
Stage A - Stage Inspection of Assembly
XYZ
DPS
1-1-13
I hereby certify that the above subassembly has been assembled in accordance with the applicable Jabiru
Pty Ltd Instructions and Maintenance procedures.
Signed:
XYZ
Date:
1-1-13
for Jabiru Aircraft Pty Ltd
MPI Release Note No.
9.9 Jabiru Engine Build Booklet
9.9.1 Engine Details
Engine Serial #:
Date:
1234578910
Filled out by
overhauler
Filled out by
supervisor
Filled out by overhauler