powered by air!
Page 25
INITIAL OPERATION
CONNECTING THE AIR CONTROLS
FASTENING THE COMPLETE CONTROL UNIT TO THE HOIST
F control:
First fasten the hose carrier. For this purpose, unscrew the
hexagon bolt and attach the hose carrier.
CONNECTING THE CONTROL HOSES
To help guide you, short sections of hose in colours corresponding
to the hoses to be connected have been inserted in the
connections in the factory.
You can connect the hoses one after another.
REMOVING THE HOSE PIECES
Press down the locking ring 1 with a suitable tool (for example
a screwdriver), pulling out the hose piece 2 at the same time.
Detaching connections
MAKING CONNECTIONS
ATTENTION!
Please ensure that the hose is not bent when
inserted.
Put the end of the corresponding hose into the bore of the
corresponding plug-in connection.
Push the hose in as far as possible, ensuring that the hose is
not bent when inserted.
Check the connection by pulling on the hose.
If air escapes from the connection while operating the hoist, try to
push the affected hose even further in.
Motor side with air hoist connecting plate
Содержание PROFI 25TI
Страница 1: ...JDN OPERATION AND ASSEMBLY INSTRUCTIONS FOR AIR HOISTS Original operation and assembly instructions...
Страница 67: ...powered by air Page 67 APPENDIX CIRCUIT DIAGRAM Rope control...
Страница 68: ...powered by air Page 68 APPENDIX Dual control...
Страница 69: ...powered by air Page 69 APPENDIX Dual control with pin valve Lower side OPTIONAL...
Страница 70: ...powered by air Page 70 APPENDIX Quadruple control...
Страница 71: ...powered by air Page 71 APPENDIX Quadruple control with pin valve Lower side OPTIONAL...