If you wish to transport your JDN Air Hoist to
another site, please observe the following points:
Carefully dismount trolley (if fitted).
Set the entire hoist down carefully; do not allow it
to drop. For weights see
Technical data,
page 43.
Lay control and supply hoses together in such
a way that they are not kinked.
Please ensure that the controls are not damaged.
Could lead to malfunctions.
Draw in the hoist's chain in such a way that loops
cannot form and the chain cannot become twisted.
Secure the chain.
B R E A K S I N O P E R AT I O N
In the case of longer operational breaks, coat
the chain and hook with a light oil film.
Motor conservation
If the motor lubrication is not renewed at the speci-
fied intervals, a protective coating must be applied
to the motor. For this purpose, use a non-resinous
and non-sticky conserving oil with conserving protec-
tion duration, which corresponds to the length of the
planned operational break.
S T O R AG E
Close off the air supply hose connection using
adhesive tape or a suitable cap, in order to prevent
dirt ingress.
Protect connection for the air supply hose from
being damaged.
Store your JDN Air Hoist in a clean and dry place.
S T O R AG E CO N D I T I O N S
S A F E T R A N S P O R TAT I O N
powered by air !
T R A N S P O R T A N D S T O R AG E
Page 18
T R A N S P O R T A N D S T O R AG E
Содержание JDN mini 1000
Страница 47: ...powered by air NOTES Page 47 ...