![iWeld GORILLA POCKETMIG 225 SYNERGIC Скачать руководство пользователя страница 54](http://html1.mh-extra.com/html/iweld/gorilla-pocketmig-225-synergic/gorilla-pocketmig-225-synergic_user-manual_2098560054.webp)
EN
2-3. Welding wire reel installation
1. Install the wire reel on the holder of wire feeding machine, the hole of wire reel should align with
fixed pin on the holder
2. Choose different wire feeding groove according to the wire dimension.
Note
: aluminum welding choose U-shape groove, other welding wire choose the V-shape
groove.
3. Loose the nut of wire pressing roller, thread the welding wire from the spool through the input
guide tube, through the roller groove and into the outlet guide tube. Note: adjust the wire
pressing roller and impact the wire, to make sure the wire will not slide. Avoid the wire deforma
-
tion due to the oversize pressure
4. Release the wire by rotating the wire reel anticlockwise. In order to avoid wire loose, the new
wire reel will fix the top of wire on the edge of wire reel. Please cut off this top of wire.
5. Choose different wire feeding groove position according to the wire diameter.
6. Press “wire check” button to lead out the wire.
2-4. Connection of Shielding Gas Bottle
Connect the CO
2
hose, which come from the wire feeder to the copper nozzle of gas bottle. The
gas supply system includes the gas bottle, the air regulator and the gas hose.
The heater cable should be plug into the socket of machine’s back side, and use the hose
clamp to tighten it to prevent leaking or air-in, so that the welding spot is protected.
Please note:
1. Leakage of shielding gas affects the performance of arc welding.
2. Avoid the sun shine on the gas cylinder to eliminate the possible explosion of gas cylinder due
to the increasing pressure of gas resulted from the heat.
3. It is extremely forbidden to knock at gas cylinder and lay the cylinder horizontally.
4. Ensure no person is up against the regulator, before the gas release or shut the gas output.
5. The gas output volume meter should be installed vertically to ensure the precisely measuring.
6. Before the installation of gas regulator, release and shut the gas for several time in order to
remove the possible dust on the sieve to avail the gas output.
2. Installation
2-1. Input wire connection
1. Each machine is equipped with primary power wire, according to the input voltage, please
connect the primary wire to the suitable voltage class.
2. The primary wire should be connected to the corresponding socket to avoid oxidization.
3. Use multi-meter to see whether the voltage value varies in the given range.
2-2. Connection of output wires
1. Connect the terminal of the earth clamp with the negative output, another side is clamped on
the workpeace
2. Connect the MIG torch with the output terminal on the wire feeding machine, insert the weld
-
ing wire through the MIG torch manually.
3. Connect the control cable socket to the wire feeder by control cable.
4. Connect the wire feeding machine input cable with the positive terminal of power source. The
control cable of wire feeding machine should be connected with the control connector of
power source.
7
6
Содержание GORILLA POCKETMIG 225 SYNERGIC
Страница 15: ...HU MIG 225 SYNERGIC MIG 230 SYNERGIC XL IGBT TECHNOL GI S SZINERGIKUS MIG MAG HEGESZT G P 15...
Страница 16: ...HU 16...
Страница 32: ...RO 16...
Страница 33: ...CUTTING EDGE WELDING R MANUALE D UTILIZZO GORILLA POCKETMIG 225 SYNERGIC GORILLA POCKETMIG 230 SYNERGIC XL...
Страница 48: ...IT 16...
Страница 67: ......
Страница 68: ...www iweld hu...