SERVICE MANUAL
SPIKA SERIES
12
3. PRIOR CHECKING AND START-UP
3.1.- PRIOR CHECKING
a) Is the machine leveled?
b) Voltage and frequency are the same as those on the nameplate?
c) Are the drains connected and operating?
d) Will the ambient temperature and water temperature remain in the following range?
ROOM
WATER
MAXIMUM
109 F / 43ºC
95 F / 35ºC
MINIMUM
50 F / 10ºC
41 F / 5ºC
e) Is water pressure appropriate?
MINIMUM
14 psig (1 bar)
MAXIMUM
85 psig (6 bar)
In case inlet water pressure is higher than 85 psig (6 bar), install a pressure regulator.
3.2.- START-UP
Once the installation instructions are followed (ventilation, site conditions, temperatures, water
quality, etc.), proceed as follows:
1.- Open the water inlet. Verify the no existence of leakages.
2.- For under counter models open the door and remove the protection elements on the shield.
For modular models remove the two locking screws on top of machine, take off the front panel
and remove protection elements on the shield and also on the thickness sensor.
Содержание SPIKA MS 500
Страница 24: ...SERVICE MANUAL SPIKA SERIES 24 5 Refrigeration diagram ...
Страница 34: ...SERVICE MANUAL SPIKA SERIES 34 7 TECHNICAL SPECIFICATIONS SPIKA NG UNDER COUNTER SPIKA MODULAR Y X Z X Y Z ...
Страница 41: ...SERVICE MANUAL SPIKA SERIES 41 9 WIRING DIAGRAMS 9 1 SPIKA NG UNDERCOUNTER MODELS ...
Страница 44: ...SERVICE MANUAL SPIKA SERIES 44 ...