4 Installation
4.1 Pre-installation
Precautions
WARNING:
•
When installing in a potentially explosive environment, ensure that the motor is properly
certified.
•
All equipment being installed must be properly grounded to prevent unexpected dis-
charge. Discharge can cause equipment damage, electric shock, and result in serious in-
jury. Test the ground lead to verify it is connected correctly.
NOTICE:
•
Electrical connections must be made by certified electricians in compliance with all inter-
national, national, state and local regulations.
•
Supervision by an authorized ITT representative is recommended to ensure proper instal-
lation. Improper installation may result in equipment damage or decreased performance.
4.2 Pre-installation
Precautions
WARNING:
•
When installing in a potentially explosive environment, ensure that the motor is properly
certified.
•
All equipment being installed must be properly grounded to prevent unexpected dis-
charge. Discharge can cause equipment damage, electric shock, and result in serious in-
jury. Test the ground lead to verify it is connected correctly.
NOTICE:
•
Electrical connections must be made by certified electricians in compliance with all inter-
national, national, state and local regulations.
•
Supervision by an authorized ITT representative is recommended to ensure proper instal-
lation. Improper installation may result in equipment damage or decreased performance.
4.2.1 Inspect the sub-base
1.
If an optional sub-base is furnished, remove it from the pump discharge head when it is shipped
assembled.
2.
Completely clean the underside of the sub-base.
You might need to coat the underside of the sub-base with an epoxy primer which you can pur-
chase as an option.
3.
Remove the rust-preventative solution from the machined topside of the barrel flange with an appro-
priate solution.
4 Installation
Model VCW Installation, Operation, and Maintenance
17
Содержание Goulds Pumps VCW
Страница 1: ...Installation Operation and Maintenance Model VCW ...
Страница 2: ......