Examples
Figure 1: Example of proper lifting method using lifting lugs
2.4 Pump storage requirements
Requirements
Submersible units require proper preparation for storage and regular maintenance during storage. The
unit is considered in storage when it has been delivered to the job site and is awaiting installation.
For specific requirements for storing motors, gearheads, engines, panels, sealing plans and other auxil-
iaries, contact the equipment manufacturer.
Storage preparation
Condition
Proper preparation
Indoor storage area (preferred)
•
Pave the area.
•
Clean the area.
•
Drain the area and keep it free from flooding.
Outdoor storage area (when indoor storage
is not available)
•
Observe all indoor storage requirements.
2.4 Pump storage requirements
10
JCU Installation, Operation, and Maintenance Manual
Содержание GOULDS PUMPS JCU
Страница 1: ...Installation Operation and Maintenance Manual JCU ...
Страница 2: ......