Commissioning, Startup, Operation, and
Shutdown
Activate the i-ALERT
™
Condition Monitor
WARNING:
Never heat the condition monitor to temperatures in excess of 300°F (149°C). Heating to these
temperatures could result in death or serious injury.
CAUTION:
Always wear protective gloves. The pump and condition monitor can be hot.
NOTICE:
Do not use the condition monitor in atmospheres containing acetic acid.
The condition monitor is ready for activation when the pump is running and has reached a steady flow,
pressure, and temperature. This process only takes a few minutes.
Place a small magnet on the condition monitor over the ITT logo and then remove it, as this example
shows.
Magnet
761B
When the condition monitor is activated it:
1. Displays a series of red LEDs followed by a solid green LED.
2. Collects eight samples that are spaced one second apart.
3. Averages these readings to establish the baseline vibration level.
4. Flashes a green LED after approximately twelve seconds.
For the first ten minutes, the green LED flashes every second for five consecutive flashes and then
pauses to take a vibration reading. More frequent measurements (every six seconds) are taken in this
startup period so that an alarm can be immediately detected.
Commissioning, Startup, Operation, and Shutdown
i-ALERT
™
Condition Monitor Installation, Operation, and Maintenance Manual
15
Содержание Goulds Pumps i-ALERT
Страница 1: ...Goulds Pumps Installation Operation and Maintenance Manual i ALERT Condition Monitor ...
Страница 2: ......
Страница 10: ...Introduction and Safety 8 i ALERT Condition Monitor Installation Operation and Maintenance Manual ...
Страница 13: ...Introduction and Safety i ALERT Condition Monitor Installation Operation and Maintenance Manual 11 ...
Страница 22: ......
Страница 23: ......