Table 8: BP200 impeller stack clearance
BP200 Impeller Stack
Required Front Clearance
1st stack 4 stages
+1.016mm ± 0.127mm | +.040" ±.005"
2nd stack
5th to 8th stages
+1.016mm ± 0.127mm | +.040" ±.005"
3rd stack
9th to 12th stages
+1.016mm ± 0.127mm | +.040" ±.005"
4th stack
13th to 16th stages
+0.635mm ± 0.127mm | +.025" ±.005"
5th stack
17th to 20th stages
+0.635mm ± 0.127mm | +.025" ±.005"
6th stack
21st to 24th stages
+0.635mm ± 0.127mm | +.025" ±.005"
7th stack
25th to 28th stages
+0.635mm ± 0.127mm | +.025" ±.005"
8th stack
29th to 32nd stages
+0.635mm ± 0.127mm | +.025" ±.005"
9th stack
33rd to 36th stages
+ 0.762mm ± 0.127mm | +.030" ±.005"
10th stack
37th to 40th stages
+ 0.762mm ± 0.127mm | +.030" ±.005"
11th stack
41st to 44th stages
+ 0.762mm ± 0.127mm | +.030" ±.005"
12th stack
45th to 48th stages
+ 0.762mm ± 0.127mm | +.030" ±.005"
NOTICE:
1. Steady bearing located between each stack - every 14 stages.
2. At completion of stacking, remove one 0.508mm | 0.020" shim from front of (suction side)
impeller 41.
7.7 Bearing and seal replacement
26
Model 3935 Installation, Operation and Maintenance Instructions
Содержание GOULDS PUMPS 3935
Страница 1: ...Installation Operation and Maintenance Instructions Model 3935 ...
Страница 2: ......