Table 6: BP70 impeller stack clearance
BP70 Impeller Stack
Required Front Clearance
1st stack
1O stages or less
+1.016mm ± 0.127mm | +0.040" ± 0.005"
2nd stack
11th to 20th stages
+0.508mm ± 0.127mm |+0.020" ± 0.005"
3rd stack
21st to 30th stages
+0.508mm ± 0.127mm |+0.020" ± 0.005"
4th stack
31st to 40th stages
+0.635mm ± 0.127mm |+0.025" ± 0.005"
5th stack
41st and 42nd stages
+0.762mm ± 0.127mm |+0.030" ± 0.005"
NOTICE:
1. Steady bearings are located between each stack - every 10 stages.
2. Use only 0.254mm | 0.010" shims for setting front clearance of impellers 25, 31 and 35.
3. At completing of stacking remove one 0.254mm | 0.010" shim from front of (suction side) im-
pellers 25, 31 and 35.
Table 7: BP100 impeller stack clearance
BP 100 Impeller Stack
Required Front Clearance
1st stack
8 stages or less
+1.016mm ± 0.127mm | +.040" ±.005"
2nd stack
9th to 16th stages
+0.508mm ± 0.127mm | +.020" ±.005"
3rd stack
17th to 24th stages
+0.508mm ± 0.127mm | +.020" ±.005"
4th stack
25th to 32nd stages
+0.635mm ± 0.127mm | +.025" ±.005"
5th stack
33rd to 40th stages
+ 0.762mm ± 0.127mm | +.030" ±.005"
6th stack 41st stage
+0.889mm ± 0.127mm | +.035" ±.005"
NOTICE:
1. Steady bearings located between each stack - every 8 stages.
2. Use only 0.254mm | 0.010" shims for setting front clearance of impellers 21, 29, 33 and 37.
3. At completion of stacking remove one 0.254mm | 0.010" shims from front of (suction side)
impellers 21, 29, 33 and 37.
7.7 Bearing and seal replacement
Model 3935 Installation, Operation and Maintenance Instructions
25
Содержание GOULDS PUMPS 3935
Страница 1: ...Installation Operation and Maintenance Instructions Model 3935 ...
Страница 2: ......