OPERATION
With pump switch off, and battery fully charged, fill water toilet and shower lines. When all valves are shut off tank,
open all faucets then turn pump switch on. Water pump will stop. Should pump fail to stop, turn switch off will begin
to flow, when water is free of air, turn faucets and see the trouble shooting guide.
off, remember you are filling the water heater and the
INSTALLATION
STEP I
Remove shipping plugs from Quad pump ports. Some
water from factory testing may spill out.
STEP 2
Install inlet A and discharge B port connectors. Firmly
push slide clips C forward to lock port connectors in
place.
STEP 3
Slide rubber mounts fully into 4 mounting tracks.
STEP 4
Mount pump vertically, with pump head down or
horizontally in an accessible location. If mounting
vertically, motor up, attach motor mounts first then pump
head mounts, while supporting weight of pump.
STEP 5
Use 1/2” I.D. flexible hose (preferably braided or
reinforced). Use hose clamps on the slip-on barb hose
connectors.
STEP 6
Install a 3/8” I.D. hose for feed lines. Use high pressure
hose on all city water lines.
STEP 7
Install a Flojet strainer in an accessible location (for
inspection and cleaning) between the tank and pump
inlet. This strainer or equivalent is required for pump
warranty to be valid.
NOTE:
Do not use with an accumulator tank.