background image

OPERATION 

With pump switch off, and battery fully charged, fill water toilet and shower lines. When all valves are shut off tank, 
open all faucets then turn pump switch on. Water pump will stop. Should pump fail to stop, turn switch off will begin 
to flow, when water is free of air, turn faucets and see the trouble shooting guide.

 

off, remember you are filling the water heater and the

 

INSTALLATION 

STEP I 

Remove  shipping  plugs  from  Quad  pump  ports.  Some 

water from factory testing may spill out.

 

STEP 2 

Install  inlet  A  and  discharge  B  port  connectors.  Firmly 

push  slide  clips  C  forward  to  lock  port  connectors  in 
place.

 

STEP 3

 

Slide rubber mounts fully into 4 mounting tracks.

 

STEP 4  

Mount  pump  vertically,  with  pump  head  down  or 

horizontally  in  an  accessible  location.  If  mounting 
vertically, motor up, attach motor mounts first then pump 
head mounts, while supporting weight of pump.

 

STEP 5 

Use  1/2”  I.D.  flexible  hose  (preferably  braided  or 

reinforced). Use hose clamps on the slip-on barb hose 
connectors.

 

STEP 6 

Install a 3/8” I.D. hose for feed lines. Use high pressure 

hose on all city water lines.

 

STEP 7 

Install  a  Flojet  strainer  in  an  accessible  location  (for 

inspection  and  cleaning)  between  the  tank  and  pump 
inlet.  This  strainer  or  equivalent  is  required  for  pump 
warranty to be valid.

 

NOTE: 

Do not use with an accumulator tank.

 

 

Отзывы: