"IB-5909 

:·�.  :-·  .. 

;;_;t��l. 

'':�\.-�:.:�;.:�! 

Fig.  12-5HV-75  Racking  and Indicator Assembly, 

"Unlock" Position 

with the  ground  bus  in  the  bottom  of  the  housing. 

The  main  circuit  movable  disconnecting  devices 

on  the  breaker  are  disengaged  and  separated  a 

safe distance from the stationary part of the devices 

located  on  the  housings. 

If  the  circuit  breaker  is  put  in  the  "CLOSE" 

position,  the  hole  for  the  racking  bar  is  covered 

and  the  breaker  may  not  be  racked  to  the  con­

nected  "OPERATING"  position,  but if  the  breaker 

is  in the  "OPEN"  position  the  racking handle  may 

be  inserted  and  the  breaker  be  racked  to  the  con­

nected  position. 

At  all  positions  of  the  circuit  breaker  between 

the  "RACKED-OUT"  and  connected  "OPERAT­

ING"  positions,  the  latch  of  the  breaker  is  held  in 

the  disengaged  position,  so  that  the  breaker  may 

not  be  closed either manually  or  electrically.  The 

interlock  that  holds  the  latch 

in 

the  disengaged 

position is mounted on the breaker and is  operated 

by the  racking  bar. 

With  the  circuit  breaker  in  the  connected 

"OPERATING"  position,  it is  usual  to  connect  the 

control circuits so that the breaker can be operated 

from  a  control  switch  mounted  on  the  front  of  the 

housing or from a remote point.  The breaker cannot 

be  operated  from  the  push  button  station  on  its 

front  panel,  Figs. 

12 

and 

13. 

The  push  button  sta­

tion operates  the breaker  only  in the  "TEST"  posi­

tion.  Other connections are sometimes made at the 

request of  the  user. 

An  outlined  procedure  for  installing  and  re­

moving a circuit breaker from  service  is as follows: 

INSTALLATION  OF  5HV-75 

CIRCUIT  BREAKERS 

I. 

The circuit breaker should  be  in the  "OPEN" 

position  and  the  indicator  at  "RACKED-OUT" 

position.  Indicator  for  locking  device  should  be 

pointing  to  "UNLOCK"  position. 

2. 

With the use of the drawout handle,  back the 

breaker  into  the  housing  so  that  the  guide  bar  on 

the  breaker  enters  the  guide  slot  in  the  housing. 

Push breaker toward rear until breaker reaches the 
floor  stop  which  latches  it  in  the  "TEST"  position. 

IO 

Fig.  13-5HV-150  and  5HV-250  Racking  and 

Indicator Assembly,  "Unlock" Position 

If  it  is  desired  to  test  the  breaker  for  operation 

electrically  and  manually  before  putting  it  into 

service,  it  may  be  done  in  this  position  by  means 

of  the  push  button  on  the  front  of  the  breaker, 

Fig. 

12 

and  by  means  of  the  maintenance  handle 

as  shown  in Fig. 

15. 

3. 

With  the  breaker  in  the  "OPEN"  position, 

and  using  the  drawout  handle,  move  the  release 

lever  toward the  guide  slot  with the  right foot,  and 

proceed  to  push  the  breaker  further  toward  the 

rear  until  the  breaker  engages  the  stop  in  the 

housing.  Turn locking device to  "LOCK"  position. 

Breaker  is  now  in  the  "RACKED-OUT"  position. 

Rack  in  by  inserting  the  crank  and  turning  clock­

wise,  Fig. 

17, 

until  pointer  on  breaker  panel  indi­

cates  the  breaker  is  in  the  connected  "OPER­

ATING"  position,  Fig. 

18. 

REMOVING  5HV -75  BREAKER  FROM 
HOUSING 

1. 

Trip  breaker  by  means  of  the  control  switch 

on  front  of  housing. 

2. 

Open  door,  insert  crank  and  rack  breaker, 

Fig.  17,  to  "RACKED-OUT"  position  as  indicated 

by pointer  on breaker nameplate. 

If it  is  desired  to  remove the breaker  completely 

from  the  housing,  continue  as  follows: 

a.  Move  locking  device  to  "UNLOCK"  posi-

tion  as  shown  in Fig. 

12. 

· ·· 

b.  Apply drawout handle to front wheels and 

draw  breaker  from  housing  until  it  reaches  the 

·floor stop. Move the  release lever toward the  guide 

slot  with  the  right  foot  and  continue  to  draw  the 

breaker  from  housing  as  shown  in Fig. 

19. 

INSTALLATION  OF  5HV-150  AND 

5HV -250  CIRCUIT  BREAKERS 

I. 

The circuit breaker should be in the  "OPEN" 

position  and  the  indicator  at  "RACKED-OUT" 

position.  Indicator  for  locking  device  should  be 
pointing  to  "UNLOCK"  position. 

www 

. ElectricalPartManuals 

. com 

Содержание 5HV-150

Страница 1: ...PE 5HV 75 5HV 150 5HV 250 AND 5HV 350 METAL CLAD SWITCHGEAR 1 t i t I 5000 VOLT 1200 2000 AND 3000 AMPERE i 1 i x rt i y t l l 1 T E CIRCUIT BREAKER COMPANY PHILADELPHIA 30 PENNSYLVANIA PRINTED IN U S A 7 59 2M w w w E l e c t r i c a l P a r t M a n u a l s c o m ...

Страница 2: ... Inspection 7 STANDARD CONSTRUCTION Shutters 7 Bus Insulation 8 Primary Disconnecting Device 8 Secondary Disconnecting Devices 8 Ground Bus and Contacts 9 Control Wires 9 5HV 75 5HV 150 AND 5HV 250 CIRCUIT BREAKERS General 9 Installation and Removing from Housing 10 SHV 350 CIRCUIT BREAKER Installation and Removing from Housing 13 HOW TO PUT THE SWITCHGEAR IN SERVICE General 14 Safety Precautions ...

Страница 3: ... once The 1 T E Circuit Breaker Company is not re sponsible for damage after delivery of shipment to the carrier However if the company is notified of such claims it will furnish forms to facilitate securing any adjustments If damage to the ship ment indicates rough handling claim for damage should be filed at once with the carrier and the I T E Circuit Breaker Company promptly notified The switch...

Страница 4: ... Switchgear Raised Rollers and Channels in Place Prior to Lateral Moving Fig 2 Switchgear Lowered on Rollers Prior to Moving Onto Track Timber Fig 4 Method oF Applying Rollers as Switchgear Progresses Onto Track Timber Fig 6 Jaclcs Removed and Switchgear Ready For Lateral Moving V _ ii J ff jFfft tl _ w w w E l e c t r i c a l P a r t M a n u a l s c o m ...

Страница 5: ... the lower flange of the sill be shimmed to proper height Temporary bolts should be inserted in all tapped holes while grouting to prevent filling or damage to the threads Where necessary power and secondary con trol conduits should be installed before the in stallation of the housings Available space for the conduits is given on the floor plan accompanying each order These conduits should not ext...

Страница 6: ...f the pothead with wiping sleeve the lead sheath should extend into the pot head for one inch minimum bell over the end of 6 the sheath and add a stress relief cone if required Clean the sheath about three inches beyond the end of the cone and apply stearine flux to end of the cone and the sheatlt Wipe the joint in the usual manner On inverted potheads the lead sheath should be extended down into ...

Страница 7: ...AS POTENTIAL IB 5909 TRANSFORMERS ARE CONNECTED DURING THE TESTS 4 Check continuity of all circuits A great deal of this work can be done after the circuit breakers are installed by energizing the control source and operating the equipment with the main circuit dead Indicating instruments check the continuity of current transformer and potential transformer circuits after the main circuit is energ...

Страница 8: ...ing Device fingers tends to increase the contact pressure dur ing a short circuit All contact finger springs are outside the current path The stationary disconnecting device is rigidly mounted in an insulating molding of cylindrical shape located within the main bus housing See Fig 8 For the SHV 350 housing the disconnecting device is similar but mounted in a molding of rectangular outline SECONDA...

Страница 9: ...ERATING positions Inserting the crank in the center hole and turning to the limit in the counter clockwise direction moves the pointer and racking bar from the connected OPERATING position out to the RACKED OUT position Turn ing the crank to the limit in the clockwise direction moves the pointer and the racking bar on the breaker into the connected position The maintenance handle is used to close ...

Страница 10: ...I w w w E l e c t r i c a l P a r t M a n u a l s c o m ...

Страница 11: ... the drawout handle back the breaker into the housing so that the guide bar on the breaker enters the guide slot in the housing Push breaker toward rear until breaker reaches the floor stop which latches it in the TEST position IO Fig 13 5HV 150 and 5HV 250 Racking and Indicator Assembly Unlock Position If it is desired to test the breaker for operation electrically and manually before putting it ...

Страница 12: ...w w w E l e c t r i c a l P a r t M a n u a l s c o m ...

Страница 13: ...ed OPERATING position Fig 18 REMOVING 5HV 150 AND 5HV 250 BREAKER FROM HOUSING 1 Trip breaker by means of the control switch on front of housing IB 5909 Fig 15 Manually Closing Circuit Breaker While in Test Position 2 Open door insert crank and rack breaker Fig 17 to RACKED OUT position as indicated by pointer on breaker nameplate If it is desired to remove the breaker completely from the housing ...

Страница 14: ...w w w E l e c t r i c a l P a r t M a n u a l s c o m ...

Страница 15: ...w w w E l e c t r i c a l P a r t M a n u a l s c o m ...

Страница 16: ...r fo Raclced Oul Position 1 t Fig 18 Circuit Brealcer in Fully Connected Position 12 Fig 17 Racking in Circuit Brealcer to Fully Conneded Position i Fig 19 Pu ling Out Circuit Breaker from Housing w w w E l e c t r i c a l P a r t M a n u a l s c o m ...

Страница 17: ...ease lever and rack the breaker to the OPERATING position as shown in Fig 21 IB 5909 Fig 21 Raclcing in SHV 350 Breaker to Fully Connected Position REMOVING 5HV 350 BREAKER FROM HOUSING 1 Trip the breaker by means of the control switch 2 Open the compartment door insert the rack ing rod push down on the racking release lever and rack the circuit breaker out to the rEST position as indicated by the...

Страница 18: ... J w w w E l e c t r i c a l P a r t M a n u a l s c o m ...

Страница 19: ...ave been placed in the test position Close all doors to the switchgear as a safety measure Those breakers necessary to energize the main bus should be moved to the connected position and closed Observe undervoltage relays or other devices that should function properly when the main bus is energized Next move each circuit breaker in turn to the connected position and close Method explained under IN...

Страница 20: ...w w w E l e c t r i c a l P a r t M a n u a l s c o m ...

Отзывы: