background image

16

ENGLISH

cHecKing tHe electRical connections 
(the power socket must be located in an 
easy to access position)

The boiler stove is equipped with an electrical power 
cable for connection to a 230V 50 Hz socket, preferably 
with a circuit-breaker. 
Variations in voltage of more than 10% can affect the 
operation of the boiler stove. 
The electrical system must be compliant; check the 
operation of the earth in particular. 
The manufacturer is not responsible for malfunctions 
due to an improperly grounded system. 
The power line must be of adequate section for the 
power of the appliance.

The power cable must not come into contact with the 
flue or other hot parts of the boiler stove.

Supply power to the boiler stove by moving the switch 
on the back from 0 to 1.

There are two 2 A fuses on the socket with switch 
located at the rear of the stove.

Vent

When performing first ignition, vent both air and water 
through the manual valve (V) located on the front of 
the top.
To access, lift the ceramic top.

The operation must also be repeated during the 
first few days of use

 and if the plant has also been 

partially reloaded. The presence of air in the ducts 
does not allow it to function properly.
To help with venting operations, the valve is equipped 
with a rubber tube.

installation

fiRst ignition (coMMissioning) PHases

• 

Make sure you have read and understood this 
manual

• 

Remove all flammable materials from the appliance 
(manuals, labels, etc). In particular remove any 
labels from the glass. 

On first ignition, there may be a slight smell of paint, 
which will disappear in a short time.

Loading the peLLets into the tank.

To access the tank, open the lid * 

 

Use UNI EN ISO 17225-2 category A1 wood pellets 
or similar regulatory products with the following 
characteristics.
diameter 6 mm
length 3-4 cm
humidity <10 %

For reasons of safety and protecting the environment, 
DO NOT burn plastic, painted wood, coal, bark or 
other such materials in the stove. 
Do not use the boiler stove as an incinerator.

Caution
Using fuels other than those specified can 
damage the appliance

1)  During this operation neVeR 
PUt the sack of pellets on the 
ceramic top, as the plastic sack 

may ruin it with the heat.

2)  Use the provided gloves when 
loading the boiler stove while it 
is operating and therefore hot to 

touch.

®

*

Fig. 2

V

Содержание Dida Idro

Страница 1: ...EN Installation use and maintenance page 2 Dida Idro Pellet boiler stove...

Страница 2: ...t The pellet boiler stove mentioned below complies with EU Regulation 305 2011 and harmonised EU standard EN 14785 2006 PELLET Boiler Stove bearing the ITALIANA CAMINI trademark and called DIDA IDRO S...

Страница 3: ...afety of those using it at risk OPERATING SEQUENCE follow the instructions for the operations described The product is uniquely identified by a number the counterfoil which is indicated on the warrant...

Страница 4: ...he product may become soiled the flue may catch fire and environmental damage may ensue cleaning the hearth when hot DO NOT CLEAN THE HEARTH WITH A VACUUM CLEANER WHILE IT IS HOT Risk of damage to the...

Страница 5: ...13 19 5 6 57 32 44 55 110 57 8 cm uscita fumi 4 cm aria combustione 55 110 5 10 10 10 ritorno 3 4 mandata 3 4 valvola sicurezza 3 bar 13 19 5 6 57 44 55 4 com 55 110 32 44 110 57 8 cm uscita fumi 4 c...

Страница 6: ...requirements of this sheet and the installation instructions for the product Nominal power Reduced power Available power 15 4 8 kW Fumes temperature at outlet 155 67 C Minimum draw 0 5 Pa Fumes flow r...

Страница 7: ...ing the structure of the boiler stove with the side panels already installed one 2 with the top Always move the stove vertically with suitable equipment and in observance of safety regulations Do not...

Страница 8: ...already fitted while the ceramic top is packed sepa rately fig 1 Position the ceramic top into the special runners on the cast iron top The D 8 washers are used as shims under the rubber supports if...

Страница 9: ...same room or area as the product may affect its draw In Italy check the compatibility pursuant to UNI 10683 and UNI 7129 in the presence of gas fired products Protection from heat and safety clearanc...

Страница 10: ...e of material rated fire reaction class A1 per UNI EN 13501 or analogous national regulations be certified with a chimney plate if metal be of uniform cross section or vary in cross section only immed...

Страница 11: ...igher storey must be at least 50 cm higher than the other it must extend beyond the back flow zone in Italy refer to UNI 10683 point 6 5 8 it must allow for maintenance of the chimney EXTERNAL AIR INT...

Страница 12: ...ensure safety If the expansion tank is built into the boiler stove this does NOT ensure proper pro tection against the thermal expansion in curred by water in the entire system Therefore installers s...

Страница 13: ...re reducer MI Delivery System P Pump circulator RA Radiators RI Return System S Drain SB Water heater ST Temperature Probe TC Boiler stove V Ball valve VA Automatic air vent valve VEC Closed expansion...

Страница 14: ...electronic controller makes the differential pressure vary between the set point value Hs and 1 2 Hs The differential pressure varies with the volume flow rate c Air relief procedure This procedure a...

Страница 15: ...green light The pump is ready for operation but does not move The pump starts rotating autonomously as soon as the error disappears Undervoltage U 160 V or overvoltage U 253 V Module overtemperature...

Страница 16: ...first few days of use and if the plant has also been partially reloaded The presence of air in the ducts does not allow it to function properly To help with venting operations the valve is equipped wi...

Страница 17: ...loaded and waiting for flame to light ON AR Boiler stove in the second stage of ignition heating up of boiler stove body and combustion start up Burn Boiler stove in the phase of heating water exchang...

Страница 18: ...boiler stove independently regulates the power according to the difference between the set tempera ture set on the display and the temperature meas ured by the probe when the desired temperature is re...

Страница 19: ...ncreases the time by 15 min with each press and using the button which decreases the time by 1 min with each press confirm the setting with the SET button set the current day of the week using the key...

Страница 20: ...ers an entire season for a normal average user If the key back lighting comes on when one of the keys is touched this indicates that the remote control is transmitting the signal a beep from the boile...

Страница 21: ...fig A placed at the top front underneath the tank lid Open the door of the hearth remove the grate 1 fig B and pour out the residue into the ash tray or suck it up with the vacuum cleaner Scrape the...

Страница 22: ...nuts clean the silicone gasket and vacuum the residue in the smoke duct 6 fig C The boiler stove is supplied with a replacement silicone gasket The quantity of residue which forms depends on the type...

Страница 23: ...d inspect the system there is an increased risk of the chimney pot catching fire We recommend against using compressed air to clean the combustion air inlet SUMMER SHUTDOWN When the stove is not in us...

Страница 24: ...SSAGES AND THEIR SOLUTIONS MESSAGE PROBLEM SOLUTION AL01 Intervenes if the water reading probe is faulty or disconnected Contact the technician AL02 displays when the logic board is not detecting the...

Страница 25: ...he gearmotor Contact the technician AL H Intervenes if there are electrical absorption problems on the gearmotor Contact the technician MESSAGES WHICH DO NOT SHUT THE STOVE DOWN BUT ARE SIMPLY WARNING...

Страница 26: ......

Страница 27: ......

Страница 28: ...code 941344 GB 03 17 A 941344 GB...

Отзывы: