29
ITALFARAD S.p .A. via IV novembre n.1 Minerbio (BO) It aly
GB
1.00 CONTROLLER MANUAL
30
1.01 GENERAL CHARACTERISTICS
30
1.02 FRONT PANEL
30
1.03 INSTALLATION
30
1.04 POWER UP
32
1.05 PARAMETER SET-UP
32
1.06 MANUAL KEYPAD SET-UP
32
1.07 TABLE OF BASIC MENU PARAMETERS
33
1.08 DESCRIPTION OF BASIC MENU PARAMETERS
33
1.09 QUICK SET-UP VIA PC
34
1.10 RAPID CT SET-UP
35
1.11 AUTOMATIC SET-UP
35
1.12 DISPLAY OF MEASUREMENTS AND REQUIRED COS SETTING
36
1.13 MAXIMUM VALUE CLEARING
36
1.14 OPERATING MODE
37
1.15 MANUAL OPERATION
37
1.16 AUTOMATIC OPERATION
37
1.17 KEYPAD LOCK
37
1.18 ADVANCED MENU SET-UP
38
1.19 ADVANCED MENU TABLE OF PARAMETERS
38
1.20 DESCRIPTION OF ADVANCED MENU PARAMETERS
39
1.21 ALARMS
41
1.22 TECHNICAL CHARACTERISTICS
42
1.23 TERMINAL BLOCK CONNECTIONS
44
1.24 EXTERNAL DIMENSIONS AND PANEL CUT-OUT
45
2.00 PROGRAMMING SOFTWARE MANUAL
46
2.01 FOREWORD
46
2.02 MINIMUM PC RESOURCES
46
2.03 INSTALLATION
46
2.04 PC-CONTROLLER CONNECTION
47
2.05 MAIN WINDOW
48
2.06 ACCESS TO SET-UP MENUS
50
2.07 ALARM PROPERTIES
50
2.08 FRONT PANEL
51
3.00 CONNECTING CABLE
52
3.01 DESCRIPTION
52
3.02 GENERAL CHARACTERISTICS
52
3.03 OPERATION
52
3.04 TECHNICAL CHARACTERISTICS
52
Содержание PFC 12
Страница 2: ......
Страница 4: ...ITALFARAD S p A viaIV novembre n 1Minerbio BO Italy 2...
Страница 21: ...19 ITALFARAD S p A viaIV novembre n 1Minerbio BO Italy PFC8 PFC12 I 1 23 CONNESSIONI MORSETTIERE PFC 5 PFC7...
Страница 46: ...ITALFARAD S p A viaIV novembre n 1Minerbio BO Italy 44 1 23 TERMINAL BLOCK CONNECTIONS PFC8 PFC12 PFC 5 PFC7 GB...
Страница 96: ...ITALFARAD S p A viaIV novembre n 1Minerbio BO Italy 94 F 1 23 RACCORDEMENT DES BORNIERS PFC8 PFC12 PFC 5 PFC7...
Страница 122: ...ITALFARAD S p A viaIV novembre n 1Minerbio BO Italy 120 1 24 DIMENSIONES EXTERNAS Y PERFORACI N E E PFC5 PFC7 PFC8 PFC12...
Страница 130: ...ITALFARAD S p A viaIV novembre n 1Minerbio BO Italy 128...
Страница 131: ......