7
MACHINE PREPARATION
1. HANDLING THE PACKAGED MACHINE
The machine is contained in specific packaging with a pallet for the handling with fork trucks. The
packages CANNOT be placed on top of each other.
The total mass of the packed machine is 38 kg
The package dimensions are as follows:
L010001
A : 1230 mm
B: 580 mm
C: 690 mm
A
C
B
2. HOW TO UNPACK THE MACHINE
1. The machine is fixed inside the box by means of reinforcements; remove them and set them aside for
future transport.
2. Remove the outer packaging.
3. Use a chute to get the machine down from the pallet, pulling it backwards.
4. Keep the pallet for any future transport needs.
WARNING: if the product is delivered in cardboard containers, handle the
packed product with suitable lifting means that comply with the legal
requirements.
3. HOW TO MOVE THE MACHINE
1.
Check that the solution tank is empty (optional)
2.
Remove the pad holder from the base (see corresponding chapter "DISASSEMBLING THE
BRUSH")
3.
Position the single brush on the pallet by means of a chute
4.
Insert the cardboard box and the previously kept supports
4. HANDLING AND TRANSPORTATION OF THE MACHINE
To handle the machine safely, proceed as follows:
1.
Check that the solution tank (optional) is empty
2.
Rotate the handlebars to the rest position (see chapter HANDLEBAR ADJUSTMENT) and fix them
in this position
3.
Tilt the machine, by putting a foot into the rear of the base body, so only the rear wheels touch the
ground and the machine can move freely.
5. HANDLEBAR COMPONENTS
The handlebar components are identified as follows:
1. Main switch control lever
2. Handlebar tilt adjustment lever
1
2
1