IPBridge Installation Guide
Page 7
1.4
: INSTALLER TOOLKIT COMPONENTS
Before an installer goes to a customer site, they need to put together their supplies
and tool-kit. The ISONAS solution is simpler to install than other Access Control
Systems, but materials are still needed. And some of those materials may be
different than what you are use to carrying. The list below identifies some important
items that you should make sure to bring with you, to the customer’s site.
A prepared installer will have:
Installer completed the on-line reseller training program.
An installer’s Tool Kit should include the following:
1.
The copy of the IP-Bridge Installation and Wiring Guide
2.
A Volt-Ohm Meter
3.
A PoE Injector
4.
A Cross-over Cat5/Cat6 cable
5.
A straight-thru Cat5/Cat6 patch cable.
6.
Basic Ethernet network cable tester (Tests for: Opens, Shorts,
Split Pairs, Mis-wires & Reversals)
7.
A spare IP-Bridge
8.
An extra Daisy-Chain power cord
9.
The ISONAS As-Built forms, which is used to record the details
of the door's installation.
The customer’s site should have Internet access. This enables the use of on-line
meeting tools, such as GoToMeeting, during any remote support sessions.