Isolite ELCD 1008 Скачать руководство пользователя страница 5

Installation  Guide
ELCD 1008

Isolite Corp  31 Waterloo Ave, Berwyn PA

5

1. See 

Wire and Terminal Specifications

 for wire size, strip length, and terminal torque.

2. Terminate load wires.

a. Run a neutral and a hot load wire through conduit to the load position for the load to be
transferred from the ELCD 1008.
b. Terminate to the respective terminals LOAD 2N (neutral) and LOAD 1H (hot) in the ECLD 1008
enclosure, securing each terminal screw onto the wire.

3. Install normal sense jumpers.

a. Install a jumper wire between terminals SENSE 3H
(hot) and NORMAL 5H (hot).
b. Install a jumper wire between SENSE 4N (neutral) and
Normal 6N (neutral).

4. Terminate normal power wires.

a. Run a neutral and a hot wire through conduit from the
normal power source to the ELCD 1008.
b. Terminate the neutral wire to the NORMAL 6N
(neutral) terminal and secure the terminal screw onto
the wire and the jumper fork terminal.
c. Terminate the hot wire to the NORMAL 5H (hot)
terminal and secure the terminal screw onto the wire
and the jumper fork terminal.

5. Terminate emergency power wires.

a. Run a neutral and a hot wire through conduit from the emergency power
source to the ELCD 1008.
b. Terminate to the respective terminals EMERGENCY 8N (neutral) and EMERGENCY 7H (hot)
in the ELCD 1008 enclosure, securing each terminal screw onto the wire.

See 

Wire and Terminal Specifications on Page 4

 for specification of wire, strip length, and terminal

torque ratings, then prepare and terminate your earth ground wire to the lug provided in the enclosure.

A simple transfer installation would be used for a load that is intended to be always on. In the event of
loss of normal power, the load is transferred to the emergency power source but remains on. There is
no control over the load.

Earth Ground

Simple Transfer

S

E

N

S

E

L

O

A

D

N

O

R

M

A

L

E

M

E

R

G

E

N

C

Y

H

2

N

4

H

5

N

6

H

7

N

3

1

H

8

N

Emergency

power panel

Normal power 

panel

Load

4

H

5

N

6

H

N

3

S

E

N

S

E

N

O

R

M

A

L

Step 3

Содержание ELCD 1008

Страница 1: ...Systems Article 702 Optional Standby Systems Section 518 3 C Assembly Occupancies Section 520 7 Theatres and Similar Locations Section 540 11 C Motion Picture Projection Rooms REMOTE TEST NORMAL POWER...

Страница 2: ...ms in accordance with Article 300 of the National Electrical Code NFPA70 NEMA Type1 Enclosure suitable for installation location that conforms to the following ambient environment 0 40 C 5 95 non cond...

Страница 3: ...l power is restored Note The re alarm input functions with up to 1 000ft 300m of 18AWG wire connected between the input and the switch Fire Alarm Inputs of up to 10 ELCD 1008 units can be wired togeth...

Страница 4: ...can accommodate installations that utilize 0 10V Auxiliary Output control and for use with either normally open or normally closed operation WARNING Before you begin pulling and terminating wire to t...

Страница 5: ...wire and the jumper fork terminal c Terminate the hot wire to the NORMAL 5H hot terminal and secure the terminal screw onto the wire and the jumper fork terminal 5 Terminate emergency power wires a R...

Страница 6: ...ch terminal screw onto the wire 3 Install a jumper wire between SENSE 4N neutral and Normal 6N neutral 4 Terminate normal power wires a Run a neutral and a hot wire through conduit from the normal pow...

Страница 7: ...V wire typically purple between 0 10V ballast and the 0 10V terminal 9 in the ELCD 1008 and secure the terminal onto the wire 3 Run a common wire typically gray between the 0 10V controller and the 0...

Страница 8: ...wer to the unit 7 Test the operation of the ELCD 1008 as described in Operation and Test below Operation and Test It is important to test the ELCD 1008 regularly because it is a life safety device NFP...

Страница 9: ...l you release the PUSH TO TEST button If emergency power is not present for the test the ELCD1008 will remain in normal mode Test Button Fuse Replacement Directing a laser pointing device at the REMOT...

Страница 10: ...is locked out and tagged out before removing the cover from this enclosure 1 Disconnect both power supply sources and lock tagout appropriately 2 Loosen the four screws and remove the cover 3 Locate t...

Отзывы: