
Installation Guide
ELCD 1008
Isolite Corp 31 Waterloo Ave, Berwyn PA
5
1. See
Wire and Terminal Specifications
for wire size, strip length, and terminal torque.
2. Terminate load wires.
a. Run a neutral and a hot load wire through conduit to the load position for the load to be
transferred from the ELCD 1008.
b. Terminate to the respective terminals LOAD 2N (neutral) and LOAD 1H (hot) in the ECLD 1008
enclosure, securing each terminal screw onto the wire.
3. Install normal sense jumpers.
a. Install a jumper wire between terminals SENSE 3H
(hot) and NORMAL 5H (hot).
b. Install a jumper wire between SENSE 4N (neutral) and
Normal 6N (neutral).
4. Terminate normal power wires.
a. Run a neutral and a hot wire through conduit from the
normal power source to the ELCD 1008.
b. Terminate the neutral wire to the NORMAL 6N
(neutral) terminal and secure the terminal screw onto
the wire and the jumper fork terminal.
c. Terminate the hot wire to the NORMAL 5H (hot)
terminal and secure the terminal screw onto the wire
and the jumper fork terminal.
5. Terminate emergency power wires.
a. Run a neutral and a hot wire through conduit from the emergency power
source to the ELCD 1008.
b. Terminate to the respective terminals EMERGENCY 8N (neutral) and EMERGENCY 7H (hot)
in the ELCD 1008 enclosure, securing each terminal screw onto the wire.
See
Wire and Terminal Specifications on Page 4
for specification of wire, strip length, and terminal
torque ratings, then prepare and terminate your earth ground wire to the lug provided in the enclosure.
A simple transfer installation would be used for a load that is intended to be always on. In the event of
loss of normal power, the load is transferred to the emergency power source but remains on. There is
no control over the load.
Earth Ground
Simple Transfer
S
E
N
S
E
L
O
A
D
N
O
R
M
A
L
E
M
E
R
G
E
N
C
Y
H
2
N
4
H
5
N
6
H
7
N
3
1
H
8
N
Emergency
power panel
Normal power
panel
Load
4
H
5
N
6
H
N
3
S
E
N
S
E
N
O
R
M
A
L
Step 3