16
NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE.
Grandview™ GV230GL
CAUTION: Wear gloves during brick installation in case of
sharp edges inside the stove.
WARNING: IF THE BRICKS ARE NOT INSTALLED EXACTLY AS
SHOWN BELOW, THEY COULD FALL OUT OF PLACE DURING
REFUELING OR BURNING OF THE STOVE CAUSING SERIOUS
INJURY.
BRICK AND BAFFLE INSTALLATION
Firebox Brick Layout as
Viewed from the Front
Figure 22 - Brick Diagram
Figure 23 - Baffle Boards Installed
Figure 24 - Baffle Boards
Letter A Brick Are Full Size
9” (229mm) Long x
4-1/2” (114mm) Wide x
1-5/16” (33mm) Thick
Back Baffle Board
Front and Rear Baffle Boards (2 each)
Front Baffle Board
1. Install brick #1-20 in the numbered sequence shown in
Figure 22
.
2. Brick’s 13 and 14 will be located between the steel firebox and rear
baffle board (already installed).
3. Once all bricks are installed confirm that the already installed baffle
boards are in there correct location and resting on the secondary
burn tubes.
17.9
6.8
6-7/8”
(175mm)
17-7/8”
(454mm)
8-A
4-A
2-A
1-A
3-A
5-A
6-A
7-A
18-A
14-A
13-A
15-A
16-A
17-A
19-A
20-A
11-A
12-A
10-A
9-A