Ironman4x4 ISNORKEL034 Скачать руководство пользователя страница 6

Page 6 of 8

15A&B.

 

 Fit supplied air box adaptor to air box. Seal both 

inner and outer mating surfaces with a liberal 

amount of silicone. Secure in place using self 

tapping screws provided.

14A&B.

 

 Remove factory adaptor from air cleaner 

as shown.

13A&B.

 

Attach front duct mounting bracket as shown and  

 

secure using hardware provided. 

 

 NOTE: Factory bracket may need to be bent up to 

allow clearance for front air duct as shown in red 

circle.

Содержание ISNORKEL034

Страница 1: ...ger Mk II XL It will take about 3 hours to install Below is a list of some required tools for installing your Ironman 4x4 Snorkel Step Drill Spanner 13mm Pop Rivet Gun IMPORTANT Snorkel installations should only be done by a qualified person and it is the responsibility of this person to ensure correct fitment and to ensure the installation is water tight NOTE Only use sensor safe sealant during i...

Страница 2: ...r mud flap air box air entry duct to air box mud guard stuffer front mud guard grill and side marker indicator PX Mk II 3A Apply masking tape around opening on mudguard and to screen pillar 4A Locate paper drilling template on page 8 of these fitting instructions and cut out shaded areas Place template in position on right hand mudguard aligning with opening and guard edge then mark holes 5A Drill...

Страница 3: ...l gasket to back of snorkel body as shown using lock tight screw studs into captive nuts on back of snorkel body NOTE Long 40mm stud goes in hole as shown 6A B Attach upper mounting bracket loosely to snorkel 2B Remove right hand front mud guard liner mud flap air box air entry duct to air box mud guard stuffer front mud guard grill and side marker indicator PX PX and PX Mk II ...

Страница 4: ...mm Apply silicone sealant Insert mounting plugs and attach mounting bracket using three self tapping screws provided NOTE When drilling holes drill far enough into pillar insulation to allow plugs to be inserted 9A Install snorkel body to mudguard Place snorkel mounting plate over studs and secure in position with nyloc nuts and body washers provided Attach to pillar bracket using M6 bolts and was...

Страница 5: ...d secure using M8 Nyloc nut and washer provided NOTE Make sure that connection is properly sealed 12A B Apply a liberal amount of silicone to both internal and external mating surfaces of front and rear ducts and push together as shown Make sure that connection is sealed 11A B Attach duct bracket to captive nut in duct Mark hole location on inner guard and drill to 8 5mm then attach using M8 bolt ...

Страница 6: ... amount of silicone Secure in place using self tapping screws provided 14A B Remove factory adaptor from air cleaner as shown 13A B Attach front duct mounting bracket as shown and secure using hardware provided NOTE Factory bracket may need to be bent up to allow clearance for front air duct as shown in red circle ...

Страница 7: ...ull wiring for side marker indicator through snorkel body and attach indicator to snorkel 18A B Check all hose connections and air box for potential leaks and seal as required 16A B Apply a liberal amount of silicone to air box adaptor and air entry duct and refit air box to vehicle NOTE Ensure connection is properly sealed ...

Страница 8: ...PAGE 1 1 FORD PX RANGER MK II ISNORKEL034 ISNORKEL034XLT SNORKEL TEMPLATE 0 10 20 30 40 50 60 70 80 90 100 MM ALIGN WITH EDGE OF FRONT GUARD PRINT AT 100 ...

Отзывы: