(B44)
Bolt
M8x20mm
4PC
4. Upright Post Installation
This assembly step requires 2 people.
Lift up the Upright Post (A02) and connect the wires (D04/D05),then
gently
tuck the
excess wire into the
Upright
Post (A02) and Main Frame (A01).
Assemble the Upright Post (A02) with 4 Bolts (B44) and
hand tighten
them to ensure proper
hole alignment. After all 4 bolts are in, secure them with the Hex Tool
(T01)
Provided.
(T01)Hex Tool with Phillips Screwdriver
Remove 6 Curve Washers M8 (B30) and 6 Bolts M8 (B13) from the Main Frame (A01) and
use them to install the U Shape Guide Rail (A12) onto the 3 tubes of the Main Frame.
3. U Shape Guide Rail Installation
(T03)Allen Wrench (M5) 1 PCS
ASSEMBLY
IMPORTANT:
After A12 is installed,
tighten Bolts (
B
49) on the Aluminum Rail (F01)
.
14
Содержание triathlon X-Class 610
Страница 2: ...6371 1 022615 2 ...
Страница 7: ...OVERVIEW DRAWING B09 7 ...
Страница 8: ...B09 OVERVIEW DRAWING 8 ...
Страница 28: ...55 75 90 100 COMPUTER 28 ...