background image

STEP C

STEP D

a. Mix  the  concrete  according  to the instructions on the bags. Note that

a  thicker  mix  of  concrete  will  dry stronger than a thin mix. Pour the
concrete into the hole, stopping  approximately 18 inches from the top
of the hole.

b. Insert  the  four  pieces  of Anchor Rebar (U5) into the  hole, pushing each

piece  firmly  to  the  bottom  of  the  hole. The  four  pieces  should  be
arranged in a square approximately 8 inches wide so that each piece of
rebar  will  be  positioned next to the J-Bolts when the  J-Bolt Template
is placed in the cement.

c. Finish  filling the hole to the top with concrete. The top of the concrete

should reach just above the level of the top of the form.

U5

a. Position  the  J-Bolt Template (U1) over  the  hole  as shown.

with the sides of the plate square with the sides of the hole.

b.Push  the  J-Bolts  (U2)  into  the  concrete  until  the   J-Bolt Template  is

resting flat against the surface of the concrete.

c. Grasp  the  tops  of  the   J-Bolts and agitate  the Template  assembly  back

and forth repeatedly to eliminate any air bubbles in the concrete. Lift the
Template  slightly  above  the  concrete  when  agitating .  Make  sure  the
Template  is  resting  on  the  concrete  after  agitating. Form  the concrete
into a downward slope away from the Pole to allow water runoff.

d. Clean off  any concrete that may be on the J-Bolt Template or the exposed

portions of the J-Bolts.

e. Using  a  carpenter

s level, make sure the Template is  square to and level

with the playing surface.

f. Allow the concrete to cure  for  a minimum of  5-7 days  before  installing

the  rest   of  your  basketball  system.  In  cold  ,  wet   weather  or  humid
climates, allow additional time for the concrete to cure.

YOU ARE NOW FINISHED WITH THE INITIAL ASSEMBLY STEPS. DO NOT PRO-

CEED WITH THE ASSEMBLY UNTIL THE CONCRETE HAS FULLY CURED .  CUR-

ING WILL TAKE A MINIMUM OF 72 HOURS. IN HUMID CLIMATES OR WET

WEATHER, ALLOW ADDITIONAL TIME FOR THE CONCRETE TO CURE.

!

!

WARNING

NEVER  USE THE  SYSTEM  WITHOUT FOLLOWING THE  CEMENTING  INSTRUCTIONS .  FAILURE TO
FOLLOW ALL OF THESE INSTRUCTIONS AND WARNINGS COULD LEAD TO SERIOUS PERSONAL INJURY
OR PROPERTY DAMAGE AS LISTED ON PAGE ONE.

5

Playing surface
(Front side)

Anchor
template

Edge of
playing surface

This side faces
playing ground

Содержание HIGHLIGHT HOOPS HIL664

Страница 1: ...n case you have to contact the manufacturer for replacement parts FAILURE TO COMPLY WITH ANY OF THE WARNINGS IN THESE INSTRUCTIONS MAY RESULT IN SERIOUS PERSONAL INJURY FAILURE TO COMPLY MAY ALSO RESULT IN PROPERTY DAMAGE PLEASE HEED ALL WARNINGS AND CAUTIONS TO ENSURE YOUR SAFETY DO NOT ATTEMPT TO ASSEMBLE THIS SYSTEM WITHOUT CAREFULLY READING AND FOLLOWING ALL INSTRUCTIONS BEGIN BY IDENTIFYING A...

Страница 2: ... THESE SAFETY INSTRUCTIONS MAY RESULT IN SERIOUS INJURY OR PROPERTY DAMAGE AND WILL VOID THE WARRANTY The owner must ensure that all players know and follow these rules to safely operate the system Proper and complete assembly use and supervision is essential for proper operation and to reduce the risk of accident or injury A high probability of serious injury exists if this system is not installe...

Страница 3: ...eel U1 1 Anchor Template U2 4 18mm Anchor J bolts U3 8 Thick washer for J bolts U4 12 Hex nut M18 U5 4 Anchor Rebar 36 L U6 4 Lock Washer M18 R1 4 Carriage bolt M10x70 R2 4 Flat Washer M10 R3 4 Flange nut M10 ITEM QTY DESCRIPTION 1 6 Hex bolt M16x200mm 2 12 Flat Washer M16 3 6 Lock nut M16 4 4 Hex Bolt M10x30mm 5 4 Lock washer M10 6 4 Flat washer M10 HARDWARE LIST PARTS LIST RIM HARDWARE UNDERGROU...

Страница 4: ...ncrete NOTE The area behind the playing surface must be cleared off by at least 3 feet to enable the user to stand behind the pole to adjust the Rim height NOTE Before digging call to locate any buried utility lines NOTE At rim height 10 distance from the face of backboard to the front of Main Post A is 48 Choose the proper location to dig for the concrete footing STEP B A Thread a 18mm Hex Nut U4...

Страница 5: ...ly to eliminate any air bubbles in the concrete Lift the Template slightly above the concrete when agitating Make sure the Template is resting on the concrete after agitating Form the concrete into a downward slope away from the Pole to allow water runoff d Clean off any concrete that may be on the J Bolt Template or the exposed portions of the J Bolts e Using a carpenter s level make sure the Tem...

Страница 6: ...8 U6 and thread a 18mm Hex Nut U4 to each J bolt Tighten the Nuts only a few turns onto the J Bolts as shown in FIGURE 1B C If the Main Post A is not exactly vertical adjust the 18mm J Bolt Hex Nuts U4 located under the Post base Tighten all of the Hex Nuts U4 Above Post base when Main Post A is vertical 6 STEP2 A Tight the Small Extension Arm C to Main Extension Arm by using 4pcs M10 x 30mm Hex B...

Страница 7: ...the top edge of Main Extension Arm plate with 10FT line on Main Post Remove the nuts and washers from pre installed bolts on backboard frame Connect Backboard frame to Extension Arm Assembly B C using removed nuts and washers B B C E B A A D D 1 2 2 3 Remove the nuts and washers from pre installed bolts on backboard frame Attach backboard frame to Main Extension arm using removed nuts and washers ...

Страница 8: ...tory assembled Slide 4 Carriage bolts M10x70mm R1 rim hardware kit thru Rim plate Spacers and Backboard secure with 4 Flat washers M10 R2 Rim hardware kit and 4 Flange nuts M10 R3 Rim hardware kit from the backside of Backboard Re attach Spring box cover to the Rim with removed screws NOTE Use a level to make sure rim is level side to side before tightening nuts C F G E R1 R2 R3 ...

Отзывы: