background image

TOOLS AND MATERIALS REQUIRED FOR ASSEMBLY

(Not Included)

1.  2 Adjustable Wrenches           10.  Concrete-1/2 yard or 14-16
2.  Socket Set                                       Bags, (80 lb. bags)
3.  9/16" Wrench                          11.  Phillips Head Screwdriver
4.  3/4" Wrench
5.  15/16" Wrench                        13.  Carpenter's Level
6.  ½"  Wrench                             14.  Water Supply
7.  Hammer or Mallet
8. Tape Measure
9.  Shovel

**

A MINIMUM  OF  SIX ADULTS IS

REQUIRED  TO LIFT UNIT INTO PLACE**

STOP!

STOP!

BEFORE YOU START

A.  Identify and inventory all parts using the checklist boxes in the parts list.  Be sure to

keep the hardware bags and their contents separate. If any parts are missing call
our Customer Service Department (

).

620-662-2233

B. Test fit all Bolts by inserting them into the respective hole. If necessary, carefully

scrape away any excess powder coating buildup from inside the holes.  Do not
scrape away all of the powder coating. Bare metal may rust.

!

!

SAFETY INSTRUCTIONS

FAILURE TO  FOLLOW THESE  SAFETY INSTRUCTIONS  MAY RESULT IN SERIOUS  INJURY OR  PROPERTY DAMAGE
AND WILL VOID THE WARRANTY. The owner must ensure that all players know and follow these rules to safely operate the

system. Proper  and  complete  assembly, use  and  supervision  is  essential  for  proper operation and to reduce  the risk

of accident  or  injury. A high  probability of serious  injury  exists  if  this  system  is  not  installed, maintained, or operated
properly.

If  using  a  ladder during  assembly, use extreme  caution. Follow  all  warnings  and  cautions  on  the ladder carefully.

6

people  are  required to lift the unit into place.

Before  digging, contact  the  appropriate  agency  to  locate  underground

power cables, gas, and  water  lines. Do not  install  the  system  within  20  feet of  overhead  power  lines.

Climate, corrosion,

or misuse could  result  in  system  failure.

If  technical  assistance  is  required, contact  the  manufacturer.

Minimum

operational height  is 7'6 to the Rim.  Most  injuries  are  caused  by  misuse  and /or  failure  to  follow  instructions.

Use  caution  when  using  the  system.

2

12. A minimum of 2 Ladders

Содержание HIGHLIGHT HOOPS HIL664

Страница 1: ...n case you have to contact the manufacturer for replacement parts FAILURE TO COMPLY WITH ANY OF THE WARNINGS IN THESE INSTRUCTIONS MAY RESULT IN SERIOUS PERSONAL INJURY FAILURE TO COMPLY MAY ALSO RESULT IN PROPERTY DAMAGE PLEASE HEED ALL WARNINGS AND CAUTIONS TO ENSURE YOUR SAFETY DO NOT ATTEMPT TO ASSEMBLE THIS SYSTEM WITHOUT CAREFULLY READING AND FOLLOWING ALL INSTRUCTIONS BEGIN BY IDENTIFYING A...

Страница 2: ... THESE SAFETY INSTRUCTIONS MAY RESULT IN SERIOUS INJURY OR PROPERTY DAMAGE AND WILL VOID THE WARRANTY The owner must ensure that all players know and follow these rules to safely operate the system Proper and complete assembly use and supervision is essential for proper operation and to reduce the risk of accident or injury A high probability of serious injury exists if this system is not installe...

Страница 3: ...eel U1 1 Anchor Template U2 4 18mm Anchor J bolts U3 8 Thick washer for J bolts U4 12 Hex nut M18 U5 4 Anchor Rebar 36 L U6 4 Lock Washer M18 R1 4 Carriage bolt M10x70 R2 4 Flat Washer M10 R3 4 Flange nut M10 ITEM QTY DESCRIPTION 1 6 Hex bolt M16x200mm 2 12 Flat Washer M16 3 6 Lock nut M16 4 4 Hex Bolt M10x30mm 5 4 Lock washer M10 6 4 Flat washer M10 HARDWARE LIST PARTS LIST RIM HARDWARE UNDERGROU...

Страница 4: ...ncrete NOTE The area behind the playing surface must be cleared off by at least 3 feet to enable the user to stand behind the pole to adjust the Rim height NOTE Before digging call to locate any buried utility lines NOTE At rim height 10 distance from the face of backboard to the front of Main Post A is 48 Choose the proper location to dig for the concrete footing STEP B A Thread a 18mm Hex Nut U4...

Страница 5: ...ly to eliminate any air bubbles in the concrete Lift the Template slightly above the concrete when agitating Make sure the Template is resting on the concrete after agitating Form the concrete into a downward slope away from the Pole to allow water runoff d Clean off any concrete that may be on the J Bolt Template or the exposed portions of the J Bolts e Using a carpenter s level make sure the Tem...

Страница 6: ...8 U6 and thread a 18mm Hex Nut U4 to each J bolt Tighten the Nuts only a few turns onto the J Bolts as shown in FIGURE 1B C If the Main Post A is not exactly vertical adjust the 18mm J Bolt Hex Nuts U4 located under the Post base Tighten all of the Hex Nuts U4 Above Post base when Main Post A is vertical 6 STEP2 A Tight the Small Extension Arm C to Main Extension Arm by using 4pcs M10 x 30mm Hex B...

Страница 7: ...the top edge of Main Extension Arm plate with 10FT line on Main Post Remove the nuts and washers from pre installed bolts on backboard frame Connect Backboard frame to Extension Arm Assembly B C using removed nuts and washers B B C E B A A D D 1 2 2 3 Remove the nuts and washers from pre installed bolts on backboard frame Attach backboard frame to Main Extension arm using removed nuts and washers ...

Страница 8: ...tory assembled Slide 4 Carriage bolts M10x70mm R1 rim hardware kit thru Rim plate Spacers and Backboard secure with 4 Flat washers M10 R2 Rim hardware kit and 4 Flange nuts M10 R3 Rim hardware kit from the backside of Backboard Re attach Spring box cover to the Rim with removed screws NOTE Use a level to make sure rim is level side to side before tightening nuts C F G E R1 R2 R3 ...

Отзывы: