ASSEMBLY
STEP 4
6
FIX THE HORIZONTALS TO THE BOTTOM
TWO AND SECOND TO TOP TWO HOLES
ON THE x2 UPRIGHTS [1]. ENSURE THAT THE
IRON KING LOGOS ARE FACING OUTWARDS.
FASTEN USING x8 100MM BOLTS [10],
x8 NUTS [8] AND x16 WASHERS [9].
REQUIRED
x8 [8]
x16 [9]
x8 [10]
x2 [1]