4
1. GENERAL DOCUMENTATION
1.1. GENERAL WARNINGS
1.2. PREAMBLE
1.3. TRANSPORT AND HANDLING
•
•
•
•
•
The present manual is an integral part of the product.
It supplies all of the necessary conditions for correct
installation, use and maintenance of the machine.
The user is obliged to read this manual carefully and
to refer to it always. It must be kept in a known place,
accessible to all authorised operators (installer, user,
maintenance technician).
The blast chiller is intended for professional use.
Therefore only qualified personnel can use it.
The blast chiller is destined to be used only for that for
which it was designed.
The manufacturer declines all liability for damage
caused by improper and unreasonable use, such as:
- improper use by untrained personnel.
- modifications or interventions not specifically for the
model.
- use of non-original spare parts or parts not specifi-
cally for the model.
- lack of compliance, even partial, with the instructions
in this manual.
Installation must be carried out by authorised and
specialised personnel, complying with the instructions in
this manual. The manufacturer declares and associates
a declaration of conformity to machinery Directive 98/37,
to Directive 2006/95 and to Directive 2004/108/CE for
each individual machine.
If the machine is supplied with a remote condensing unit,
the installer will take care to check all of the connections
and to leave a declaration that execution was carried out
professionally and in compliance with the provisions of
the above-mentioned Directive.
•
Loading and unloading the appliance from the transporta-
tion vehicle can be performed with a forklift truck or pallet
mover. The forks must be longer than half the length of
the appliance. The lifting device must be chosen suitably,
based on the dimensions and mass of the packaged
machine, indicated on the packaging labels.
All due precautions must be taken to handle the appli-
ance in order not to damage it, respecting the indications
on the packaging.
1.4. UNPACKING
Remove the cardboard, wooden or crate packaging upon
which the blast chiller is placed. Lift the blast chiller with a
suitable means (lift truck), remove the wooden base and
position the machine in the intended area (see par. 2.2).
After having removed the packaging, make sure that
the blast chiller is intact.
Remove the protective PVC film from all sides (Fig.1).
Use protective gloves to handle the packaging
and wooden base.
N.B.: all of the various packaging components must
be disposed of according to the Standards in force in
the Country where the appliance is used. In no case
must anything be dispersed into the environment.
•
•
•
•
Fig. 1
In compliance with directive 97/23/EC, based on the
model the equipment is supplied together with the user
manuals and declarations of conformity of the:
• safety valve;
• liquid receiver;
• liquid separator;
• liquid re separator;
• compressors
• oil separator;
• safety pressure switches.
The joints made by IRINOX S.p.a. comply with the
standard EN14276-2
IMPORTANT NOTE:
IRINOX reminds you that all the
machines must undergo periodical inspections in
compliance with national standards in force.
In particular, from the Italian market: the plant must be
fully inspected, especially the integrity of the pressurised
chiller circuits, after ten years of operation, as required in
Italy by Annex B of the Ministerial Decree 1 December
2004 n°329 for assemblies belonging to categories I-IV
containing fluids of group 2.
Содержание EasyFresh
Страница 7: ...7 2 3 DIMENSIONAL DATA FRONT VIEW SIDE VIEW TOP VIEW EF10 1 EF20 1 EF30 1 EF45 1...
Страница 35: ......