Inf
o
rm
at
io
n
an
d
Non
-c
o
nt
rac
tua
l v
isu
al
s.
Sub
je
ct
t
o
t
ec
hn
ic
al
c
ha
ng
e wi
tho
ut
no
ti
ce
.
This document is the property of IRFTS. It shall not be reproduced or shared with third party without agreement IRFTS
9.1.3)
* Reference nomenclature
3°) Set up the first reference support batten d*.
Position this support batten 260 mm to the break of
the bottom flashing flooring, for support batten wider than 250mm leave a gap of 10mm between the
Reference support batten (d) and and (k).
Screw the support batten following the recommendations page 17 to 19 to know the type and the
number of screws to be used.
Installation of the bottom flashing support batten and
the reference
support batten.
The bottom flashing batten and the
bottom flashing itself will have to be
2 tiles longer on each side of the PV
field.
0°
21
PV field centered on the slope
Reverse slope FORBIDDEN
1
°
) Determination of dimension A (Bottom flashing batten)
The « C » dimension is the Minimum batten width necessary to avoid reverse slope
on the bottom flashing. It’s possible to use a wider batten, this will simply raise up
the PV field.
2°) Set up the bottom flashing batten at 10 mm MAXIMUM to the top of the tile .
Use the wood (f) and
(k) defined in the preceding operation. Screw with stainless screws 5x** milled head.
Roof inclination (°)
Minimum batten
width C dimension
(mm)
Mini A
dimension
(mm)
10 to 12
250
260
13 to 16
220
230
17 to 19
180
190
20 to 24
150
160
25 to 50
120
130
(k)
(f)
Reference support batten(d)*
Model "M-1" 60 Cells 6" Landscape