iQe COMFORT?30 Скачать руководство пользователя страница 7

7

1.3.2  Regulation 
 

c.h. temperature (fig. 2)

To set the temperature of the water 
for  heating,  press  the  key

1

2

3

4

of  the 

controls  .  The  display  will  be  as 
shown  in  the  figure.  Change  the 
values  with  the  key

 

(

1

2

3

4

  and 

1

2

3

4

).

 

Standard  display  will 
return  by  pressing  the  key

1

2

3

4

again, 

or  after  60  seconds  if  no  key  is 
pressed.
With  a  system  water  return 
temperature of less than 55 degrees, 
condensate  will  be  produced,  and 
the efficiency increased. 

1.3.3  Regulation 
 

of the external sensor

If an external sensor is installed, the 
value  of  the  output  temperature  is 
automatically chosen by the system, 
which  quickly  adjusts  the  of  flow 
temperature  on  the  basis  of  the 
external temperature. 
If  you  wish  to  change  the  value 
of  the  temperature,  increasing 
or  decreasing  that  calculated 
automatically  by  the  electronic 
card,  proceed  as  indicated  in  1.3.2. 
The level of various correction of a 
value  of  temperature  proportional 
calculated.  The  display  will  be  as 
shown.

1.3.4  Regulation d.h.w. 
 

temperature (fig. 3)

To  set  the  desired  temperature 
D.H.W.,  press  the  key

1

2

3

4

of  the 

controls.  The  display  will  be  as 
shown  in  the  figure.  Change  the 
values with the key

 

(

1

2

3

4

and

1

2

3

4

).

The  standard  display  will  return  by 
pressing the key

 

1

2

3

4

 

again, or after 10 

seconds if no key is pressed.

1.3.5  to switch off the 
 

boiler (fig. 1)

In the case of a short absence, press 
for more than two seconds the key

1

2

3

4

 

of the controls. The display will be as 
shown in figure (boiler in stand-by). 
In  this  way,  leaving  the  electricity 
and  the  gas  supply  connected,  the 
boiler  is  protected  from  frost  and 

from the pump becoming jammed.
If  the  boiler  is  not  used  for  a 
prolonged period, it is advisable to 
disconnect  the  electricity  supply, 
by  switching  off  the  main  switch 
of the system, and to close the gas 
tap  and,  if  low  temperatures  are 
expected,  to  completely  drain  the 
hydraulic  circuits  to  avoid  pipes 
being damaged from frost.

1.4 

ERRoRS and SolUtionS

When  there  is  a  functioning  error, 
the  display  controls  shows 

a  red 

lEd.

 Descriptions of the errors with 

the relative alarms and solutions are 
given below:

– 

al 02 (fig. 5)

  If  the  water  pressure  detected  is 

lower than 0.5 bar, the boiler will 
stop  and  the  display  will  show 
“AL 02”. Using the external filling 
device, bring the system pressure 
back to normal so that the pressure 
indicated  by  the  hydrometer(fig 
5) is between 1 and 1.5 bar.

  WHEN  FILLING  HAS  BEEN 

COMPLETED 

CLOSE 

THE 

CONNECTIONS  OF  THE  FILLING 
LOOP AND DISCONNECT IT.

  If it necessary to repeat the system 

refilling  procedure,  it  advisable 
to  contact  a  qualified  technical 
personnel to check the seal of the 
heating system(to check whether 
there are any leaks).

– 

al 05

 

Request assistance from qualified 
technical personnel.

Fig. 2

Fig. 3

1

2

3

4

1

2

3

4

1

2

3

4

0

4

1

3

2

bar

1

2

3

4

5

7

8

9

10

11

12

13

14

15

17

18

16

19

Fig. 5

Содержание COMFORT?30

Страница 1: ...ructions Ensure that these instructions are left for the user after completion of the BENCHMARK section Please read the Important Notice within this guide regarding your boiler warranty UK Cod 6318138...

Страница 2: ...rranty offered all you have to do is to adhere to these 3 simple conditions The installation must be carried out to Manufacturers Benchmark Standards by a Gas Safe Registered Engineer and recorded in...

Страница 3: ......

Страница 4: ...planation of its operation The installer is legally required to complete a commissioning checklist as a means of complyng with the appropriate Building Regulations England and Wales All installations...

Страница 5: ...ler has completed the Gas Boiler System Commissioning Checklist in the installation guide It is a requirement of the warranty that your installer registers your boiler installation with GAS SAFE REGIS...

Страница 6: ...s made available almost immediately at the appliance outlet but the final temperature and time taken for the hot water to reach a tap depends upon the potentiometer setting the rate at which water is...

Страница 7: ...5 To switch off the boiler fig 1 In the case of a short absence press for more than two seconds the key 1 2 3 4 of the controls The display will be as shown in figure boiler in stand by In this way le...

Страница 8: ...ins supply must be fused at 3 amp 1 8 VENTILATION If the appliance is installed in a cabinet the cabinet MUST NOT be used for storage purposes Any ventilation provided for the appliance during install...

Страница 9: ...9 NOTES...

Страница 10: ...10 NOTES...

Страница 11: ......

Страница 12: ...iqe co uk Trade House BA22 8RT Phone 0800 0152252...

Отзывы: