iQe COMFORT?30 Скачать руководство пользователя страница 5

opERating inStRUctionS foR thE USER

1.1 

INTRODUCTION ...............................................................................................................................................   6

1.2 

APPLIANCE OPERATION

1.3 

OPERATING INSTRUCTIONS

1.4 

ERRORS AND SOLUTIONS ..........................................................................................................................   7

1.5 

MINIMUM CLEARANCES ..............................................................................................................................   8

1.6 

ROUTINE SERVICING 

1.7 

ELECTRICAL SUPPLY

1.8 

VENTILATION

1.9 

CLEANING

1.10  SAFETY

contEntS

VERy impoRtant!

All Gas Safe Registered installers carry a ID card.

You can confirm that your installer is registered by calling 

Gas Safe Register on 0800 408 5577.

Please ensure that your installer has completed the Gas Boiler System 

Commissioning Checklist in the installation guide.

It is a requirement of the warranty that your installer registers your 

boiler installation with GAS SAFE REGISTER. 

This should be no later than 30 days after installation.

You will receive a Buildings Regulations Compliance Certificate 

(in Scotland a Declaration of Safety). 

The certificate number must be recorded on the checklist.

It is also a condition of any extended warranty that the boiler is serviced 

annually, and this is recorded in the Service Record. 

 comfoRt 30: 

Gas Council number 47-283-47

these appliances comply with the S.E.d.B.U.K. scheme, band “a”

Содержание COMFORT?30

Страница 1: ...ructions Ensure that these instructions are left for the user after completion of the BENCHMARK section Please read the Important Notice within this guide regarding your boiler warranty UK Cod 6318138...

Страница 2: ...rranty offered all you have to do is to adhere to these 3 simple conditions The installation must be carried out to Manufacturers Benchmark Standards by a Gas Safe Registered Engineer and recorded in...

Страница 3: ......

Страница 4: ...planation of its operation The installer is legally required to complete a commissioning checklist as a means of complyng with the appropriate Building Regulations England and Wales All installations...

Страница 5: ...ler has completed the Gas Boiler System Commissioning Checklist in the installation guide It is a requirement of the warranty that your installer registers your boiler installation with GAS SAFE REGIS...

Страница 6: ...s made available almost immediately at the appliance outlet but the final temperature and time taken for the hot water to reach a tap depends upon the potentiometer setting the rate at which water is...

Страница 7: ...5 To switch off the boiler fig 1 In the case of a short absence press for more than two seconds the key 1 2 3 4 of the controls The display will be as shown in figure boiler in stand by In this way le...

Страница 8: ...ins supply must be fused at 3 amp 1 8 VENTILATION If the appliance is installed in a cabinet the cabinet MUST NOT be used for storage purposes Any ventilation provided for the appliance during install...

Страница 9: ...9 NOTES...

Страница 10: ...10 NOTES...

Страница 11: ......

Страница 12: ...iqe co uk Trade House BA22 8RT Phone 0800 0152252...

Отзывы: