iQe COMFORT?30 Скачать руководство пользователя страница 6

6

opERating inStRUctionS foR thE USER

THE  GAS  SAFETY  (INSTALLATION 
AND  USE)  REGULATIONS  1996.  It 
is  the  law  that  all  gas  appliances 
are  installed  by  a  registered 
person,  in  accordance  with  the 
above  regulations.  Failure  to  install 
appliances  correctly  could  lead 
to  prosecution.  It  is  in  your  own 
interest, and that of safety, to ensure 
that the law is complied with. 

it  is  essential  that  the  appliance 
is  correctly  earthed.  an  electricity 
supply of 240 V - 50 hz fused at 3 
a is required.

Read  these  instructions  carefully 
before  attempting  to  operate  the 
appliance.

1.1 

intRodUction

The 

  comfoRt 30 

family  is  a 

fully automatic, wall mounted, room 
sealed, fan assisted boilers. 
When  operating  in  winter  mode, 
the  appliance  provides  central 
heating  as  required  and  produces 
instantaneous  hot  water  upon 
demand. 
When  operating  in  summer  mode, 
the central heating is not operational 
however the appliance continues to 
supply  hot  water  whenever  it  is 
required. 

1.2 

appliancE opERation

A  demand  of  hot  water  will  be 
sensed  by  the  appliance  detecting 

water flow (providing that the flow 
rate is above 2 l/m - 0.5 gal/min). 
The fan will start and the burner will 
light  at  full  output.  If  the  draw  off 
rate  is  near  the  maximum  design 
flow  rate  the  appliance  will  run 
continuously  at  full  output  until  a 
tap  is  either  turned  off  or  the  flow 
rate  is  reduced  in  which  case  the 
heat output will reduce accordingly 
to maintain a steady temperature.
Hot water is made available almost 
immediately  at  the  appliance 
outlet,  but  the  final  temperature 
and  time  taken  for  the  hot  water 
to  reach  a  tap  depends  upon  the 
potentiometer  setting,  the  rate  at 
which  water  is  drawn  off,  and  the 
length  of  the  pipe  between  the 
boiler  and  the  tap.  When  the  tap 
is  turned  off,  the  appliance  will 
revert to C.H. mode (if set on winter 
position)  otherwise  the  burner  will 
be  extinguished  pending  the  next 
demand for hot water.

1.3 

opERating 

 

inStRUctionS

1.3.1  Boiler ignition (fig. 1)

The first ignition of the boiler must 
be carried out by qualified technical 
personnel. 
When  it  is  necessary  to  restart  the 
boiler follow this procedure:
–  ensure  that  the  gas  supply  is 

turned on. 

–  turn  on  the  electrical  supply,  a 

green LED should illuminate. After 
a  delay  of  30  seconds  the  boiler 
should  resume  operation;  if  the 
green led is on, this indicates the 
presence of voltage.

n.B.:  after  a  delay  of  15  minutes 
(paR  5  default  setting)  if  non  of 
the buttons are pressed the keypad 
will “lockup” to resume operation, 
press  any  of  the  keys  for  more 
than  two  seconds  (the  display 
will indicate one to four segments 
progressively before unlocking the 
controls).

winter

Press  the  key

1

2

3

4

of  the  controls  to 

activate the winter mode functioning 
(heating  and  D.H.W.).  The  display 
will be as shown in the figure.

Summer

Press  the  key

1

2

3

4

of  the  controls 

to  activate  the  summer  mode 
functioning  (only  the  production 
D.H.W.). The display will be as shown 
in the figure.

1

2

3

4

1

2

3

4

Fig. 1

attEntion: Use the keys to alter the value of any function, a beep indicates that the 
change was accepted. the display will remain lit for 15 minutes (paR 5 default).

1

2

3

4

Содержание COMFORT?30

Страница 1: ...ructions Ensure that these instructions are left for the user after completion of the BENCHMARK section Please read the Important Notice within this guide regarding your boiler warranty UK Cod 6318138...

Страница 2: ...rranty offered all you have to do is to adhere to these 3 simple conditions The installation must be carried out to Manufacturers Benchmark Standards by a Gas Safe Registered Engineer and recorded in...

Страница 3: ......

Страница 4: ...planation of its operation The installer is legally required to complete a commissioning checklist as a means of complyng with the appropriate Building Regulations England and Wales All installations...

Страница 5: ...ler has completed the Gas Boiler System Commissioning Checklist in the installation guide It is a requirement of the warranty that your installer registers your boiler installation with GAS SAFE REGIS...

Страница 6: ...s made available almost immediately at the appliance outlet but the final temperature and time taken for the hot water to reach a tap depends upon the potentiometer setting the rate at which water is...

Страница 7: ...5 To switch off the boiler fig 1 In the case of a short absence press for more than two seconds the key 1 2 3 4 of the controls The display will be as shown in figure boiler in stand by In this way le...

Страница 8: ...ins supply must be fused at 3 amp 1 8 VENTILATION If the appliance is installed in a cabinet the cabinet MUST NOT be used for storage purposes Any ventilation provided for the appliance during install...

Страница 9: ...9 NOTES...

Страница 10: ...10 NOTES...

Страница 11: ......

Страница 12: ...iqe co uk Trade House BA22 8RT Phone 0800 0152252...

Отзывы: