
Page 7
Commercial Installation Examples
Supply Duct
The Perfect 16 can be installed on supply ducts, provided the airflow of the duct is 2000 cfm or less. Balance
volume dampers and/or registers as necessary.
clean air out
dirty air in
Before Supply Plenum
For installations of 2000 cfm (5 tons) or less, the Perfect 16 can be installed before the Supply Plenum.
Note: The Perfect 16 is designed to sustain a maximum of 149°F (65°C).
Supply Duct Branch
The Perfect 16 can be installed on supply duct branches, provided the airflow to the branch is 2000 cfm or
less. Balance volume dampers and/or registers as necessary.
For commercial applications, where the airflow on the return side of the air handler exceeds the recommended airflow, an
alternative installation method is to install the Perfect 16 on a section of the supply side.
Important note: It is not recommended to install the Perfect 16 where airflow or ambient temperature exceeds
149°F (65°C).