Commercial Installation Instructions

The Perfect 16 can be suspended from exposed ceiling joists or the ceiling surface. 
Alternatively, it can be floor-mounted, fixed onto platform or plenum box. (see page 4 or 6
for examples).

1.

Choose a location between the air handler and the supply registers, which is readily
accessible for checking and replacing the filter. Allow at least 24.5 in. (622 mm)
clearance in front of the ID-2225 and 28.5 in. (724 mm) clearance in front of the 
ID-2530. 

2.

Determine the correct air inlet and air outlet side of the system. The air inlet is marked
with “Cut this Panel for Duct Connection – DIRTY AIR IN”.  The air outlet is marked with
“Cut this Panel for Duct Connection – CLEAN AIR OUT”.  Both panels will need to be cut
for the proper fit of the ducting prior to installation.

3.

Remove connection panel and adapt for duct air handler connection as necessary
(see page 7, Cutting Openings Into Panels).  If flex duct is used, it is strongly
recommended to use 18” round collar for the ID-2225 and 20” for the ID-2530. Best
performance is achieved with rectangular openings. For maximum allowable opening,
see diagram on page 2. Never cut a panel with a Swiss cross.

4.

When positioning the system, ensure that “Dirty Air In” is in your air inlet.

5.

Attach ducting. For duct connection, follow the local installation codes.

6.

If the Perfect 16 system is connected directly to the air handler, remove all filters and
secure the cabinet via panel from inside to the air handler using sheet metal screws.
Ensure correct airflow direction when reinserting filters. Refer to “Filter Replacement”
instructions (see page 9).

7.

In basement installations, sheet metal turning vanes may be necessary to improve air
movement through an elbow in the duct.

8.

To hang or suspend the Perfect 16, replace four TX30 screws with four Perfect 16 eye
bolts. Ensure the materials and installation are able to support at least three times the
weight of the system. These are available for a nominal fee. Order number 207 90 50 01.
* Ensure that all building codes are followed.

9.

Use foil tape to seal all duct joints. Important: All leaks on the return side of the system
will cause dirty air to leak into the return air stream. Leakage also occurs in many air
handlers via the blower door. The blower door should also be sealed with foil tape for
the best air cleaning results.

10. Fill out the filter replacement label with the date of the next scheduled filter

replacement, which should be no more than 3 years from the current date
(based on 50% usage).

11. Check and inspect system for leakage.

12.  Test for efficiency with a laser particle counter, such as a ParticleScan, and complete the

Perfect 16 “10X Cleaner Air Certificate” (North America only).

13.  Register warranty online at www.iqair.com/support.

1.

Allow for clearance in front of the
access door

5.

Attach ducting

2.

Ensure “DIRTY AIR” is in you air inlet

6.

Remove filters and secure via panel
from inside to the air handler. 

8.

The Perfect 16 eye bolt kit.*

10.

Fill out filter replacement label

Содержание ID-2225

Страница 1: ...Features High efficiency close to 100 removal of pollution particles 0 3 microns Low pressure drop 0 18 to 0 22 inch w g at rated airflow Low maintenance up to 3 year filter life Safe produces no ozo...

Страница 2: ...ion Examples Page 7 Supply duct Supply duct branch Before supply plenum Cutting Round Openings into Panels with Hole Cutting Tool Page 8 Panel selection Insulation cutting Collar attachment Disassembl...

Страница 3: ...een designed to provide the highest possible air cleaning rate at the lowest possible pressure drop for residential and commercial forced air systems HVAC Two models are available The ID 2225 is ideal...

Страница 4: ...anel for Duct Connection DIRTY AIR IN The air outlet is marked with Cut this Panel for Duct Connection CLEAN AIR OUT Both panels will need to be cut for the proper fit of the ducting prior to installa...

Страница 5: ...ilter system is installed vertically and return air enters the furnace side inlet 5 ton application Up Flow Furnace Filter system is installed horizontally beneath the furnace Return air enters from t...

Страница 6: ...l filters and secure the cabinet via panel from inside to the air handler using sheet metal screws Ensure correct airflow direction when reinserting filters Refer to Filter Replacement instructions se...

Страница 7: ...fect 16 is designed to sustain a maximum of 149 F 65 C Supply Duct Branch The Perfect16 can be installed on supply duct branches provided the airflow to the branch is 2000 cfm or less Balance volume d...

Страница 8: ...t your transition Never cut a panel with a Swiss cross 4 Fit the insulation back into the panel Lay the panel on a hard protected surface Using a sharp blade cut the insulation along the panel opening...

Страница 9: ...o the inner side of the panel and fix the insulation to the collar with a duct tape 11 Stick the tape tightly to the insulation Slice or notch the tape to secure it smoothly to a round opening 12 Atta...

Страница 10: ...to the filter insertion slots 5 Rotate the frame so all four sides can be tapped out gradually If you try to remove the legs all at once you may damage the frame 6 Remove the top frame 7 The two fram...

Страница 11: ...the filter access panel off until after all four filters are replaced 5 Make sure the filters are installed correctly by aligning the airflow arrows 6 Carefully insert each of the four filters 7 Inst...

Страница 12: ...ycle used filters per local laws or regulations 5 Insert new filters starting from the bottom 6 Ensure that you align the filters with the airflow arrows matching the airflow arrows on the cabinet 7 D...

Страница 13: ...9 30 months 0 30 76 0 38 96 33 months 0 33 82 0 41 103 36 months 0 36 89 0 44 110 Minimum Efficiency Reporting Data ID 2225 ID 2530 Minimum Efficiency Reporting Value MERV MERV 16 492 fpm 2 5m s MERV...

Страница 14: ...m 8 a m 4 30 p m PST Monday Friday Call 1 888 560 1020 or visit www iqair com support To expedite your service request please have the following information ready when contacting us IQAir model item n...

Страница 15: ...Page 15 Notes...

Страница 16: ...www iqair com 208 04 01 01 130724_IQ_MA_P16_Installation_E 2013 The IQAir Group All rights reserved...

Отзывы: