IQAir ID-2225 Скачать руководство пользователя страница 4

Page 4

Residential Installation Instructions

The Perfect 16 can be floor-mounted, fixed onto a platform, plenum box, or be suspended
from exposed ceiling joist or the ceiling surface (see page 4 for installation examples).

1.

Inspect the installation area. Remove existing filters or systems that may add additional
pressure drop to the system. 

2.

Choose a location between the main return duct and the furnace, which is readily
accessible for checking and replacing the filter. Allow at least 24.5 in. (622 mm)
clearance in front of the ID-2225 and 28.5 in. (724 mm) clearance in front of the 
ID-2530. 

3.

Determine the correct air inlet and air outlet side of the system. The air inlet is marked
with “Cut this Panel for Duct Connection – DIRTY AIR IN”.  The air outlet is marked with
“Cut this Panel for Duct Connection – CLEAN AIR OUT”.  Both panels will need to be 
cut for the proper fit of the ducting prior to installation. Never cut a panel with a 
Swiss cross.

4.

Remove connection panel and   adapt for duct connection as necessary (see page 7,
Cutting Openings Into Panels).  If flex duct is used, it is strongly recommended to use
18” round collar for the ID-2225 and 20” for the ID-2530. Best performance is achieved
with rectangular openings. For maximum allowable opening, see diagram on page 2.

5.

When positioning the system, ensure that “Dirty Air In” is in your air inlet.

6.

Attach ducting. For duct connection, follow the local installation codes.

7.

If the Perfect 16 system is to be connected directly to the furnace, remove all filters and
secure the cabinet via panel from inside to the furnace using sheet metal screws.

Содержание ID-2225

Страница 1: ...Features High efficiency close to 100 removal of pollution particles 0 3 microns Low pressure drop 0 18 to 0 22 inch w g at rated airflow Low maintenance up to 3 year filter life Safe produces no ozo...

Страница 2: ...ion Examples Page 7 Supply duct Supply duct branch Before supply plenum Cutting Round Openings into Panels with Hole Cutting Tool Page 8 Panel selection Insulation cutting Collar attachment Disassembl...

Страница 3: ...een designed to provide the highest possible air cleaning rate at the lowest possible pressure drop for residential and commercial forced air systems HVAC Two models are available The ID 2225 is ideal...

Страница 4: ...anel for Duct Connection DIRTY AIR IN The air outlet is marked with Cut this Panel for Duct Connection CLEAN AIR OUT Both panels will need to be cut for the proper fit of the ducting prior to installa...

Страница 5: ...ilter system is installed vertically and return air enters the furnace side inlet 5 ton application Up Flow Furnace Filter system is installed horizontally beneath the furnace Return air enters from t...

Страница 6: ...l filters and secure the cabinet via panel from inside to the air handler using sheet metal screws Ensure correct airflow direction when reinserting filters Refer to Filter Replacement instructions se...

Страница 7: ...fect 16 is designed to sustain a maximum of 149 F 65 C Supply Duct Branch The Perfect16 can be installed on supply duct branches provided the airflow to the branch is 2000 cfm or less Balance volume d...

Страница 8: ...t your transition Never cut a panel with a Swiss cross 4 Fit the insulation back into the panel Lay the panel on a hard protected surface Using a sharp blade cut the insulation along the panel opening...

Страница 9: ...o the inner side of the panel and fix the insulation to the collar with a duct tape 11 Stick the tape tightly to the insulation Slice or notch the tape to secure it smoothly to a round opening 12 Atta...

Страница 10: ...to the filter insertion slots 5 Rotate the frame so all four sides can be tapped out gradually If you try to remove the legs all at once you may damage the frame 6 Remove the top frame 7 The two fram...

Страница 11: ...the filter access panel off until after all four filters are replaced 5 Make sure the filters are installed correctly by aligning the airflow arrows 6 Carefully insert each of the four filters 7 Inst...

Страница 12: ...ycle used filters per local laws or regulations 5 Insert new filters starting from the bottom 6 Ensure that you align the filters with the airflow arrows matching the airflow arrows on the cabinet 7 D...

Страница 13: ...9 30 months 0 30 76 0 38 96 33 months 0 33 82 0 41 103 36 months 0 36 89 0 44 110 Minimum Efficiency Reporting Data ID 2225 ID 2530 Minimum Efficiency Reporting Value MERV MERV 16 492 fpm 2 5m s MERV...

Страница 14: ...m 8 a m 4 30 p m PST Monday Friday Call 1 888 560 1020 or visit www iqair com support To expedite your service request please have the following information ready when contacting us IQAir model item n...

Страница 15: ...Page 15 Notes...

Страница 16: ...www iqair com 208 04 01 01 130724_IQ_MA_P16_Installation_E 2013 The IQAir Group All rights reserved...

Отзывы: