6.3
Opening and Closing the Housing
The stacked housing elements are held together by two locking arms that latch into the diffuser. To open the system,
follow the steps below.
1.
Disconnect the IQAir system from the power supply before at temp ting to
open the system.
2.
Press the first locking arm outward, using both thumbs as shown. Press
just hard enough to release the arm from its snap-in position in the
diffuser. Disengage the other arm in the same way.
3.
Pull both locking arms evenly outwards until they snap into place and
remain open. Access to all filter elements is now possible (to change a
specific filter, refer to the appropriate section below).
4.
To close the housing, simply align the housing elements and push the
locking arms inwards simultaneously until they snap back into the housing
(top of the diffuser).
IQ
Air
20
Chapter 6
– Replacing Filters
Opening
Closing
6.3.1 Troubleshooting When Closing the Housing
If the IQAir system does not close properly, the upper part of the system
may be offset against the lower part.
To solve this problem, simply open both locking arms again, ensure the
housing is aligned, and push both locking arms in simultaneously.
6.4
Replacing the Pre-Filter (F1)
1.
Open the locking arms, making sure they
are fully extended outward. For details,
refer to the section 6.3.
2.
Opening the arms will cause the up per
part of the housing to separate from
frame 1. This will leave a narrow gap.
3.
Keeping the locking arms open, place your
hands on op po site sides of frame 1, lift it
slightly and pull it out slowly. As the
frame is with
drawn, tilt it pro
gres
sively
upward to remove it com pletely.
gap
Содержание Cleanroom H 13
Страница 1: ...Cleanroom H13 User Manual Swiss Made...
Страница 27: ...27 Notes...
Страница 28: ...www iqair com Swiss Made IQ_MA_CRH13_NE_US_130724...