Product Description of BRT-109
Page 3 of 4
Shenzhen Asia Bright Industry co., Ltd., Building 10, Asia Industrial Park, Gangtou, Bantian, Shenzhen, China.
© 2015 All rights reserved. Subject to change without notices.
Step two:
Wiring according to the diagram and the labelled ports of the switch; and
Step three: Install the switch to the wall box using screws and put back the front plate.
Fig. 4
BRT-109 Installation Guide
BRT-109 Operation Guide:
Switch on/off the load: After BRT-109 is powered on, touching each of the 2 on/off buttons
will turn on or turn off the loads respectively, when the delay-off function is not setup.
Touching the Off button will turn off all the loads in the same time.
When a load is turned on, the corresponding button will become brighter in blue.
Set up delay-off function: Use a screwdriver to pry off the front plate to access the dip
switches as shown in Fig.5. Switching the first two dip switches to on will set up each on/off
button for delay-off operation respectively.
The delay-off time is set at 30 seconds at factory. Please talk to our sales representative if
other customized settings are required.