Side Mountng
Brackets
L Brackets
2
Hardware Installation
Step 1
While one person positions the switch in the rack and holds it in place, the second person
loosely screws the front brackets to the rack.
Standard Rack Mounting:
A standard rack mounting kit is provided with your GCL1908 / GCL1916 and can be mounted
in 1U of rack space. The following diagram shows the required components to mount the LCD
KVM to the rack.
Note:
It takes two people to mount the switch: one to hold it in place; the other to screw it in.