iMars grid-tied solar inverters Installation
19
4.1 Unpacking inspection
The inverter has been thoroughly tested and rigorously checked before delivery, but damage may
still occur during transportation. Before unpacking, check carefully whether the product information
in the order is consistent with that on the nameplate of the package box and whether the product
package is intact. If any damage is detected, please contact the shipping company or the supplier
directly. Please also provide photos of the damage to get our fastest and best service.
Put the inverter into the package if not used and protect it from humidity and dust.
Check as following after unpacking:
(1) Ensure no damage to the inverter unit.
(2) Ensure the operation manual, port and installation accessories in the package.
(3) Ensure no damage or loss to the items in the package.
(4) Ensure the information of the order is the same as that of the name plate.
Below are the detailed lists:
Packing list of 12kW / 15kW / 17kW / 20kW-M inverter:
Figure 4.1 Packing list of12kW / 15kW / 17kW / 20kW-M inverter
Содержание iMars
Страница 1: ...Operation Manual iMars Grid tied Solar Inverter INVT Solar Technology Shenzhen Co Ltd...
Страница 2: ......
Страница 6: ...iMars grid tied solar inverters Contents 4 9 Contact us 64 10 Technical parameters 65...
Страница 35: ...iMars grid tied solar inverters Installation 33 Figure 4 22 Fix the waterproof cover of junction box...