iMars BD3KTL-PS Energy Storage Inverter Commissioning
26
Chapter 5 Commissioning
Step 1: Check the following requirements before commissioning:
1)
Ensure the inverter is firmly secured.
2)
Check if the open circuit DC voltage of the batteries meets requirement (Refer to Chapter 9).
3)
Check if the open circuit utility voltage of the utility is at approximately same to the nominal
expected value from local utility company.
4)
Check if connection of AC cable to grid (utility) and connection of batteries are correctly.
5)
AC circuit breaker and battery circuit breaker are installed correctly.
Step 2: Switch on the battery circuit breaker, and then set the date/time, the charge and discharge
time, and other battery related parameters after the inverter power on (Refer to Chapter 6).
Step 3: Switch on the AC circuit breaker, and then the inverter works according to the charge and
discharge time which have been set.
NOTE:
Parameters about the battery must be set strictly accordance with battery specifications.