![INVT BD100KTR-P Скачать руководство пользователя страница 45](http://html1.mh-extra.com/html/invt/bd100ktr-p/bd100ktr-p_manual_2085726045.webp)
44
If only the circuit breaker is disconnected, the cable connection terminals in the AC/DC
cabinet of the energy storage inverter are still live!
Before opening the cabinet door and starting the formal maintenance work, it is necessary
to disconnect not only the circuit breaker, but also the front and back stage circuit breakers
of the energy storage inverter.
After the energy storage inverter is out of operation, please wait at least 15 minutes before
operating it.
9.2.3
Maintenance Work And Cycle
Table 9-1 Maintenance Work Item Sheet
Maintenance
project
Maintenance content
Recommendation
cycle
Save record
Export data with USB and save backup
。
1 months
Inverter
Inspection
Observe whether the appearance of energy storage
inverter is damaged, deformed or rusted.
Listen to the abnormal sound of the energy storage
inverter.
LCD was used to observe the running parameters.
Use thermal imager and other detection systems to detect
the heating status.
Check whether the ventilation, ambient temperature,
humidity and dust around the inverter meet the
requirements.
Half a year
Duct cleaning
Check duct dust.
Listen to if there is any abnormal vibration when the fan is
running.
Use compressed air and turn on the fan for cleaning.
Clean or replace the air filter
Half a year (bad
environment
needs to be
shortened as
appropriate)
Security
function
Check whether the EPO button is invalid
Check whether the LCD closed inverter function is invalid.
Half a year
Circuit
connection
Check all electrical connections for looseness or poor
contact.
Check the surface of all cables and metal surfaces for
damage or scratch.
Check that the insulation bandage of all terminals is off
Check screw position for signs of overheating.
Check the color change of the copper bars and bolts
1 years
Circuit
Breaker
Maintenance
Check all circuit breakers for failure.
Check whether the circuit breaker or load switch is
damaged.
1 years
Identification
check
Check device warning signs and other equipment labels.
If blurred or damaged, please replace it in time
1 years
Due to the capacitance of DC bus, it will take at least 15 minutes to wait until the energy
storage inverter is completely cut off. Before removing the dust, please use the multimeter
measurement to confirm that there is no electricity in the machine, so as to avoid electric
WARNING
WARNING
WARNING
Содержание BD100KTR-P
Страница 1: ...BD 30 150kW P Inverter User Manual...
Страница 19: ...18 Figure 5 2 Packaged Handling Figure 5 3 Unpackaged Handling...
Страница 23: ...22 Figure 5 12 500 kW 630 KW Vent Size...
Страница 41: ...40 Figure 8 9 System_System Settings...
Страница 43: ...42 Figure 8 11 Switch menu...