![Invest MSC-24/QD FP Скачать руководство пользователя страница 19](http://html1.mh-extra.com/html/invest/msc-24-qd-fp/msc-24-qd-fp_service-manual_2085183019.webp)
17
7.8 Evacuation
Procedure:
1. Connect the vacuum pump to the charge set’s centre hose.
2. Evacuation for approximately one hour.
Confirm that the gauge needle has moved toward -0.1 Mpa (-76 cmHg) [vacuum of 4 mmHg or less].
3. Close the valve (Low side) on the charge set, turn off the vacuum pump, and confirm that the gauge needle
does not move (approximately 5 minutes after turning off the vacuum pump).
4. Disconnect the charge hose from the vacuum pump.
Vacuum pump oil, if the vacuum pump oil becomes dirty or depleted, replenish as needle.
Содержание MSC-24/QD FP
Страница 8: ...6 3 Dimension 3 1 Indoor Unit MSC 24 QD FP MSH 24 QD FP...
Страница 9: ...7 3 2 Outdoor Unit MSC 24 QD FP...
Страница 11: ...9 5 Refrigerant cycle diagram...
Страница 12: ...10 6 Wiring diagram 6 1 Indoor Unit MSC 24 QD FP MSH 24 QD FP...
Страница 13: ...11 6 2 Outdoor Unit MSC 24 QD FP...
Страница 37: ...35...