2-10
DIP Switch Number 4, 5, 6-Load Control Algorithm
LVR LVD
DIPSW-4 DIP
SW-5 DIP
SW-6
12V 24V 48V 12V 24V 48V
OFF OFF OFF
12.6V
25.2V
50.4V
11.1V
22.2V
44.4V
OFF OFF ON
12.8V
25.6V
51.2V
11.3V
22.6V
45.2V
OFF ON OFF
13.0V
26.0V
52.0V
11.5V
23.0V
46.0V
OFF ON ON
13.2V
26.4V
52.8V
11.7V
23.4V
46.8V
ON OFF OFF
13.4V
26.8V
53.6V
11.9V
23.8V
47.6V
ON OFF ON
13.6V
27.2V
54.4V
12.1V
24.2V
48.4V
ON ON OFF
13.8V
27.6V
55.8V
12.3V
24.6V
49.2V
ON ON ON
12.0V
24.0V
48.0V
10.5V
21.0V
42.0V
Select 1 of the 8 standard load control algorithms.
Dip Switch Number 7-Auto Reconnect or Disconnect standard low voltage
Switch 7
Selection
ON
Auto Reconnect after low voltage returning to Dip Switch 4~6
standard LVR setting
OFF
Manual Reconnect after low voltage disconnect (LVD)
Manual reconnect of the loads is allowed when voltage has not exceeded the LVR setting.
To reconnect the loads, press the reset button on the front panel of the unit. If the voltage is
below the LVR level, the DC load can be reconnected from approximately 6 minutes.
Multiple reconnects are allowed, but the “on” time duration will vary with battery voltage.
( Approximately 5 seconds when the battery voltage is under 10V).
When Dip Switch 7 is ON position, it allows the controller to be set for Auto reconnect of
the DC load when the voltage exceeds the LVR setting.
DIP switch number 8-User define LVR, LVD
Switch 8
Load Control algorithm
ON
User define (VR1, VR2)
OFF
Dip Switch 4~6 selection
The latest LED Meter display will show the voltage setting value of LVR (VR2) and LVD
(VR1) and the user can adjust those values directly.
LVR range set by VR2:
12.0V~14.0V (12V system)
24.0V~28.0V
(24V
system)
48.0V~56.0V
(48V
system)
LVD range set by VR1:
10.5V~12.5V (12V system)
21.0V~25.0V
(24V
system)
42.0V~50.0V
(48V
system)
Содержание SS-30C
Страница 1: ......
Страница 29: ...3 5 ...
Страница 30: ...3 6 ...
Страница 50: ...Appendix B ...
Страница 51: ......