2-3
Ground
BTS
BATTERY
Solar Array
D C Load
or
G ND
GND
PV+/
LOA D+
BAT+
Installation wiring for solar charging or DC load control
Solar charging or DC load control:
Step 1: Open the access cover
Step 2: Mount the SunStar using the enclosed template.
Step 3: Adjust the 8 switches in the DIP switch. Each switch must be in the correct position.
Step 4: Attach the BTS if battery charging will be temperature compensated (not for load
control).
Step 5: Connect the battery power wires to the SunStar. Then connect the solar array wires
(or DC load wires).
Step 6: Close the cover.
※
Step 4 is optional.
D IV E R S IO N
L O A D
G round
B T S
B A T T E R Y
H ydro
W ind
S olar
G N D
G N D
P V + /
L O A D +
B A T +
Installation wiring for DC diversion charge control
Содержание SS-30C
Страница 1: ......
Страница 29: ...3 5 ...
Страница 30: ...3 6 ...
Страница 50: ...Appendix B ...
Страница 51: ......