EN
16
Wind protection insert WSE
•
Installation and operating instructions
1.
Slide the wind protection insert into the wall sleeve as far as the stop tape
(iV-Twin: 1 x wind protection insert per wall sleeve)
.
Make sure that
the slant is oriented downwards.
Make sure that
the handle (green arrow) is pointing towards the interior.
3.2 Slide in the wind protection insert
Requirements: The inner cover's panel has been removed.
1.
From the building's interior, push the thermal accumulator insert as far as the wind protection insert.
Make sure that
the green handle is pointing towards the interior.
Make sure that
the protective grid is facing towards the interior.
2. Connect the controller.
Make sure that
the markings on the plug and socket are aligned.
3.
Install the inner cover's base plate.
4.
Place the fi lter back into the inner cover's base plate.
5. Attach the inner cover's panel.
2
1
3
2
1
4
5
3.3 Install the thermal accumulator insert and inner cover
Requirements: The wind protection insert is inserted.
Содержание iV-Twin
Страница 2: ...2 ...