SECTION 8—ARMS
Part No 1134839
61
Power Tiger™
Adjusting T-Arm Depth
NOTE: For this procedure, refer to FIGURE 8.2.
1. Remove the two mounting screws that secure the arm pad to the arm tube.
2. Remove the two socket screws that secure the arm tube to the T-arm post.
3. Reposition the arm tube on the T-arm post:
• Desk Length Arms - to one of three positions depending on the desired arm pad
depth.
• Full Length Arms - to one of five positions depending on the desired arm pad
depth.
NOTE: Additional positions are obtainable by turning the arm tube 180°.
4. Re-secure the arm tube to the T-arm post with the two socket screws. Torque to 60-70
in-lbs.
5. Reattach the arm pad to the arm tube with the two mounting screws. Tighten securely.
6. Repeat for the opposite side, if necessary.
FIGURE 8.2
Adjusting T-Arm Depth
Mounting Screw
Arm Pad
Mounting
Screw
Arm Tube
NOTE: If necessary,
turn arm tube 180° to
obtain two additional
positions.
T-Arm Post
Socket Screws
NOTE: Desk length
arm shown.