Set-up
4.9
Inspecting the Bed
All connectors will arrive plugged into the junction box.
1.
Check all electrical connections on junction box
A
at foot end
to ensure that all motors are plugged into the correct locations.
2.
Plug the junction power box cord
B
into a 110-volt outlet.
3.
If equipped with a crossover cable, plug in crossover cable.
4.
Before placing bed into use, test the bed by operating it through
all phases of operation.
JUNCTION BOX CONNECTOR IDENTIFICATION
C
= Pendant Cord Connector
D
= Hi/Lo Motor Connector
E
= Power Cord Connector
F
= Head Motor Connector
G
= Foot Motor Connector
H
= Pull Tube
I
= Pendant and Pendant Cord
1123842-I-05
27
Содержание IVC Bariatric Bed
Страница 5: ...Overview 2 Overview 2 1 Label Locations 1123842 I 05 5...
Страница 6: ...IVC Bariatric Bed 6 1123842 I 05...
Страница 41: ...Notes...
Страница 42: ...Notes...
Страница 43: ...Notes...