SECTION 6—PANEL ASSEMBLY
31
Testing/Replacing the Power Switch
NOTE: For this procedure, refer to FIGURE 6.3 on page 31.
Tools required for this procedure are:
• Ohmmeter
1. Remove the cabinet. Refer to Removing/Installing the Cabinet on page 25.
2. Remove the control panel. Refer to Removing/Installing Control Panel on page 29.
3. Note the location of the two wire connectors of the power switch for later replacement.
4. Remove the two wire connectors from the power switch.
A. Using an ohmmeter, test the continuity of the switch by placing the meter leads on
the switch terminals where the wires were connected.
B. Turn the switch to the On position.
C. If no indication of continuity is achieved, proceed to step 5. If continuity is
achieved, proceed to Step 7.
5. Release the four retaining clips and push the power switch out of the control panel.
6. Install power switch into control panel as shown.
7. Install the two wire connectors onto the power switch.
8. Install the control panel. Refer to Removing/Installing Control Panel on page 29.
9. Install the cabinet. Refer to Removing/Installing the Cabinet on page 25.
FIGURE 6.3
Testing/Replacing the Power Switch
Wire
Connectors
Retaining Clips
Power Switch
Retaining Clips
Control Panel