Electrical installation
INTORQ | BA 14.0199 | 08/2016
33
5.5.3
Reduced switch-off times
AC switching must also be carried out for DC switching (fast engagement)! Otherwise, there will be no over-
excitation when it is switched back on.
5.5.4
Permissible current load at ambient temperature
1 For screw assembly with metal surface (good heat dissipation)
2 For other assembly (e.g. adhesive)
Delayed engagement
Fast engagement
A
A
Mains
B
Bridge
C
Coil
Содержание BFK470 Series
Страница 46: ...Notes INTORQ BA 14 0199 08 2016 46 Notes...
Страница 47: ...Notes INTORQ BA 14 0199 08 2016 47...
Страница 48: ...Notes INTORQ BA 14 0199 08 2016 48...
Страница 49: ...Notes INTORQ BA 14 0199 08 2016 49...
Страница 50: ...Notes INTORQ BA 14 0199 08 2016 50...
Страница 51: ......