120
IO
SAVE THESE INSTRUCTIONS
Page 18
(120IO) SEQUOIA SPIRIT™ WOOD-GRAIN FRAME POOL ENGLISH 7.5” X 10.3” PANTONE 295U 08/08/2009
English
S
E
T
U
P
I
N
S
T
R
U
C
T
IO
N
S
POOL ENCLOSURE SETUP (continued)
4a. Side panel with holes installation
• Locate the side panel with holes outside the pool liner where the inlet & outlet holes are
located. Unwrap the side boards from pack and slide the side board combination with
one hole
(23)
first down the support posts and insert onto the vertical edge of the
bottom rail. Follow with the number sequence from bottom to top. The groove of the
board needs to be inserted fully onto the tongue of previous board. The printing on the
side boards needs to be facing outward. Then slide the side board combination with two
holes
(22)
marked with number “5 & 6” through the support posts and insert onto the
tongue of side board marked with number “4” (see drawings 11.1 & 11.2).
• In clockwise motion screw the plunger valve connectors
(18)
onto the threaded strainer
connectors which were already installed on the pool liner during the pool set up (see
drawing 11.3). In a clockwise motion screw the plunger valves onto the plunger valve
connectors
(18)
. Close the plunger valves by pushing the handle down and turn in a
clockwise direction to lock as described in filter pump manual. Now, the strainer valve
caps
(19)
can be unplugged out of the threaded strainer connectors from the inside of
the pool (see drawings 11.4 & 11.5).
• Continue to finish the side panel installation by installing the rest of the side boards
marked with number “7” and “8” (see drawing 11.6).
11.1
11.3
11.4
11.5
11.6
11.2