background image

 

 
SEPAMAT F_maual_Vers.2.8f

 

9

 
 

Pos. 

Board code 

Connection description 

 

Pos.

Board code 

Connection description 









10 
11 

KH PE 
BR PE 
NE PE 
NE bl 
S1 brn 
S1 bl  
BR brn 
BR bl  
BR schw 
PU bl 
PU brn 

-free- 
Protective pump controller 
Protective mains connection  
N-Mains connection 230 V, blue 
-free- 
-free- 
L1-Pump controller, brown 
N-Pump controller, blue  
Pump controller, black 
N-Pump, blue 
L1-Pump, brown 

 12 

13 
14 
15 
16 
17 
18 
19 
20 
21 
22 

SS PE 
PU PE 
LP PE 
NE br 
SS brn 
SS bl 
KH schw 
KH grün 
KH rt 
LP bl 
LP brn 

-free- 
Protective pump controller 
-free- 
L1- Mains connection 230 V, brown 
-free- 
-free- 
-free- 
-free- 
-free-  
-free- 
-free- 

Table:  Overview of cable connections 
 
 
 
Loosen the screws to change the capacitor and take off the 
cable-end eyelet ring. 
 
Attention:  
Do not let the nuts fall down into the inner coil of the motor!  
 
Note: 
When connecting a new capacitor the polarity is not 
important. 

Содержание SEPAMAT F 20

Страница 1: ...WATER WE RE IN OUR ELEMENT www intewa com SEPAMAT F Installation and user manual...

Страница 2: ...nents of the basic controller 8 5 3 Components of the centrifugal pump 10 5 4 Components of the separation chamber 11 6 Installation instructions 12 6 1 Wall mounting 12 6 2 Connection to the mains wa...

Страница 3: ...guidelines have to be read carefully before installing the product The instructions mentioned have to be followed strictly Modifications to the product are not permitted otherwise the warranty become...

Страница 4: ...o not install any electrical products in flood prone areas The operator is responsible for adherence of the safety and installation guidelines 3 Scope of delivery Separation unit SEPAMAT F Wall mounti...

Страница 5: ...rrent 4 A 5 8A Motor capacitor 12 5 F 20 F Max discharge pressure 4 5 bar 5 5 bar Max flow rate 80 l min 110 l min Noise level ca 60 dBA ca 65 dBA Pump start up pressure 1 0 2 2 bar adjustable factory...

Страница 6: ...ump SEPAMAT F20 40 2 Pump terminal box with basic controller 3 Vent cock 4 Pressure line shut off valve 3 4 female 5 Pump controller 6 Separation chamber 7 Stopcock for mains water 3 4 female 8 Mains...

Страница 7: ...cally fulfils the requirements of the following EU directives EG Directives for machines 89 392 EWG in accordance with 91 368 EWG EG Low voltage directives 73 23 EWG EG Directives for electromagnetic...

Страница 8: ...mmended that only experienced professionals use the pressure setting option The pump start up pressure is set to 1 5 bar by default That means the pump switches on when the system pressure falls below...

Страница 9: ...e basic controller The basic controller will be found in the terminal box of the pump 1 where all the electrical components of the SEPAMAT F are connected as well as the motor capacitor required for s...

Страница 10: ...controller blue Pump controller black N Pump blue L1 Pump brown 12 13 14 15 16 17 18 19 20 21 22 SS PE PU PE LP PE NE br SS brn SS bl KH schw KH gr n KH rt LP bl LP brn free Protective pump controlle...

Страница 11: ...pcs 380 CAPACITOR KIT 47 CAPACITOR ZBR 1 ZBR 1 16 16 O RING NOZZLE 1 pc 1 pcs 84 84 PLUG FRONT 1 pc 1 pcs 88 88 SHUTTER 1 pc 1 pcs 490 490 RUBBER SPACER 1 pc 1 pcs 89 89 SPRING SHUTTER 1 pc 1 pcs 370...

Страница 12: ...6 should be approx 2 cm below the overflow rim 4 when the floating valve is closed backside of the container The water level can be adjusted by twisting the black floating body 5 The floating valve i...

Страница 13: ...s mounted on a wall with the supplied wall bracket The lid and lateral distances indicated should be adhered to when mounting to provide clear maintenance access The SEPAMAT F is wall mounted in such...

Страница 14: ...e and stopcock Screw the gland screw into the container connection and carefully tighten with a fixed wench Note The flexible hose must not be overtightened as this may interfere with the internal flo...

Страница 15: ...ne set is connected to the pump controller The flexible hose and the shut off valve then connect to the pressure line set and the pressure line 6 5 Connecting the emergency overflow The SEPAMAT F has...

Страница 16: ...tering the SEPAMAT F The position of the backwater level determines the type of line a Backwater level above the emergency overflow drainage height of the supplemental supply container Connection of t...

Страница 17: ...e the pump primed with water automatically over the mains water tank In this case the pump cannot be manually filled with water 3 Close the pressure line shut off valve 4 Open the air vent hold a buck...

Страница 18: ...lecting switch 8 Trouble shooting Malfunction Cause Solution Pump does not start and the red LED is on Pump shuts off after a brief hum and the RESET Replace the capacitor No water in the priming tank...

Страница 19: ...Bestellbezeichnung Multistage centrifugal pump SEPAMAT F 20 1 RMF P20 Multistage centrifugal pump SEPAMAT F 40 1 RMF P40 Basic controller 2 RMF BPL Pump controller BRIO 5 RMF PST BRIO Separation cham...

Страница 20: ...ls at INTEWA GmbH J licher Stra e 336 52070 Aachen Tel 0049 241 96605 0 Fax 0049 241 96605 10 Email info intewa de Internet www intewa de For customers in other countries For any queries ordering of s...

Отзывы: