Version 2.0 (04/2019) Online
Translation of the original operating manual
37 von 54
Assembly and installation
Connection of the external speed control
1 ZoneControl
4 Input SPEED (Pin 3)
2 RollerDrive
5 External speed setting (e.g. by potentiometer)
3 Peer-to-peer connection
An external SPEED signal can be connected to control the speed of the whole conveyor externally. The signal should
only be connected to one ZoneControl, as it is transmitted via the PTP connection to all other ZoneControl. The
position of the ZoneControl within the conveyor and the cable length of the PTP connection is immaterial.
The voltage range for the SPEED signal is between 0 and 10 V DC with a maximum current of 2 mA. DC voltage must
be kept stable to maintain a constant conveyor speed.
Содержание ZoneControl
Страница 1: ...INSPIRED BY EFFICIENCY Operating Manual Interroll ZoneControl ...
Страница 6: ......
Страница 54: ...INSPIREDBY EFFICIENCYEN 04 2019 Version 2 0 2019 INTERROLL ...