
Interroll Roller curve SH 1210
Maintenance and repair
44
Version 1.0 (06/2022) en
Translation of original operating instructions
Replacing the roller
1
2
1
1
Taper screw
2
Roller
Replacing the roller is only necessary if the PolyVee heads show signs of wear or the roller is
damaged.
WARNING
Risk of injury from crushing and electrocution
Installation and maintenance tasks on a conveyor system while it is in operation can cause
crushing and electric shock.
4
Power down the entire conveyor module and ensure that it cannot be started accidentally.
Fasten screws with a tightening torque of 19 Nm.
Requirement:
R
The module is shut down.
4
Remove finger guard and PolyVee belt,
see "PolyVee-Riemen ersetzen", page 48
4
Unscrew taper screws (1) in roller (2) on the left and right from the C-profile of the side
frames.
4
Pull the roller to the top out of the side frames at an angle. Remove drive belt from roller in
the process.
4
Place a new roller in the open elongated hole. Pull the drive belt onto the roller in the
process and observe the centering of the roller: Screw roller in the side frame with taper
screws on the right and left.
4
Reinsert the finger guard and fasten it with screws.